I was walking along the Worcester and Birmingham Canal towpath, which runs alongside the cross city line, and saw something I didn't know existed before: a signal on the line was displaying a flashing double yellow aspect. What does this mean?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

sprinterguy

Established Member
Joined
4 Mar 2010
Messages
11,048
Location
Macclesfield
Common as they may be across the network, this has piqued my interest as I'm quite familiar with the section of the Cross City line alongside the Birmingham and Worcester canal and I've never noticed a flashing double yellow on that stretch before: There's nothing shown on the most recent route map I have to hand, and usually flashing yellows are in advance of a fast diverging junction, which doesn't seem relevant to the section of route between Bournville and New Street?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
15,717
Location
Glasgow
I was walking along the Worcester and Birmingham Canal towpath, which runs alongside the cross city line, and saw something I didn't know existed before: a signal on the line was displaying a flashing double yellow aspect. What does this mean?

Junction set for train to diverge to a line with a lower permissible speed than the mainline. It allows a higher diverging speed than approach release from Red where a train is checked practically to a stand.

I believe there were introduced about the same time as the HSTs as a result of their superior braking.
 

ForTheLoveOf

Established Member
Joined
7 Oct 2017
Messages
6,416
Common as they may be across the network, this has piqued my interest as I'm quite familiar with the section of the Cross City line alongside the Birmingham and Worcester canal and I've never noticed a flashing double yellow on that stretch before: There's nothing shown on the most recent route map I have to hand, and usually flashing yellows are in advance of a fast diverging junction, which doesn't seem relevant to the section of route between Bournville and New Street?
Exactly my thoughts - the area hasn't been resignalled recently (though signal heads have gradually been made LED over the years). It was all regular 4-aspect colours when I used to frequent the line.
 

sprinterguy

Established Member
Joined
4 Mar 2010
Messages
11,048
Location
Macclesfield
It was all regular 4-aspect colours when I used to frequent the line.
Yeah that was my understanding as well, and a quick glance at the route map appears to confirm this. Quite curious as to where a flashing double yellow might have popped up: The only divergence in that neck of the woods is onto the Lifford curve, which as far as I am aware is controlled by the standard feather, as it's only 10mph round the curve.
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,457
Location
Somewhere
Common as they may be across the network, this has piqued my interest as I'm quite familiar with the section of the Cross City line alongside the Birmingham and Worcester canal and I've never noticed a flashing double yellow on that stretch before: There's nothing shown on the most recent route map I have to hand, and usually flashing yellows are in advance of a fast diverging junction, which doesn't seem relevant to the section of route between Bournville and New Street?

Flashing yellows are no longer reserved just for high speed junctions. As hexagon789 says, they allow a higher speed approach than what would have been possible under standard approach release. I know of a couple of areas where the diverging speed is 30 or 40 but has flashing yellows. I don't know the area in the OP but there must be a junction somewhere there that the flashing yellows relate.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,793
Location
Nottingham
Junction set for train to diverge to a line with a lower permissible speed than the mainline. It allows a higher diverging speed than approach release from Red where a train is checked practically to a stand.

I believe there were introduced about the same time as the HSTs as a result of their superior braking.
Yes, there was a risk of an HST overspeeding a junction if they just obeyed the normal aspects with the system of approach control in use at the time (some "main aspect yellow" routes I think). But it's since become much more widespread, effectively giving the driver a warning of a divergence and allowing them to optimise their speed for the actual conditions rather than to brake towards a red at a particular place.

Where more exactly is the signal in question? The only diverging junctions I can think of on that section are towards the Lifford curve and the crossovers at Kings Norton. The former is rarely used so I'd expect the signal to be for the more frequent divergence at Kings Norton, as a signal that can display more than one flashing aspect isn't allowed. The sequence would be flashing YY, flashing Y, then steady Y with indicator at the junction signal releasing to less restrictive aspect if line clear ahead, so this signal would be some way from the junction.
 

ForTheLoveOf

Established Member
Joined
7 Oct 2017
Messages
6,416
The only divergence in that neck of the woods is onto the Lifford curve, which as far as I am aware is controlled by the standard feather, as it's only 10mph round the curve.
Yeah, it's a tight radius that one. I don't think there are flashing aspects for diverging at Lifford South Junction either (plus this is well after the section of parallel running the OP talks about) so I'm a bit mystified.

Isn't there a flashing yellow on the approach to Kings Norton from the University direction?
If cleared for the fast lines it's a straight-ahead run with the speed staying the same 45mph until more or less the start of the King's Norton disused platforms where it's 90mph. It's 30mph onto the (electrified) slow lines, but the Simsig simulation of the area has it as an ordinary approach-controlled turnout. Of course, that may be out of date.
 

Darandio

Established Member
Joined
24 Feb 2007
Messages
10,674
Location
Redcar
The 2015 documentation I have here doesn't show any flashing aspects on that section. It's not unknown for official documentation to be wrong or incomplete though.
 

sprinterguy

Established Member
Joined
4 Mar 2010
Messages
11,048
Location
Macclesfield
Isn't there a flashing yellow on the approach to Kings Norton from the University direction?
The former is rarely used so I'd expect the signal to be for the more frequent divergence at Kings Norton, as a signal that can display more than one flashing aspect isn't allowed. The sequence would be flashing YY, flashing Y, then steady Y with indicator at the junction signal releasing to less restrictive aspect if line clear ahead, so this signal would be some way from the junction.
If that proves to be the case then signal SY48 would be the one with a flashing double yellow aspect: That's to the north of Bournville station, which is adjacent to the canal so that would make sense.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
15,717
Location
Glasgow
Yes, there was a risk of an HST overspeeding a junction if they just obeyed the normal aspects with the system of approach control in use at the time (some "main aspect yellow" routes I think). But it's since become much more widespread, effectively giving the driver a warning of a divergence and allowing them to optimise their speed for the actual conditions rathe

Thanks, I couldn't recall the precise details but knew it was something to do with their better braking.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,555
Location
Mold, Clwyd
Hasn't the Midland line signalling around Birmingham been upgraded recently with the move of control from Saltley PSB to WMSC?
It included extension down the line for the electrification extension to Bromsgrove, and on to the River Avon bridge approaching Tewskesbury.
The New St end (western approach) has also been upgraded.
There are of course flashing single yellows as well.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,793
Location
Nottingham
If cleared for the fast lines it's a straight-ahead run with the speed staying the same 45mph until more or less the start of the King's Norton disused platforms where it's 90mph. It's 30mph onto the (electrified) slow lines, but the Simsig simulation of the area has it as an ordinary approach-controlled turnout. Of course, that may be out of date.
With 6 cross-city trains per hour crossing onto the Slow lines and many of them having faster trains close behind, it would be an excellent candidate for a flashing aspect.
 

Mordac

Established Member
Joined
5 Mar 2016
Messages
2,303
Location
Birmingham
Common as they may be across the network, this has piqued my interest as I'm quite familiar with the section of the Cross City line alongside the Birmingham and Worcester canal and I've never noticed a flashing double yellow on that stretch before: There's nothing shown on the most recent route map I have to hand, and usually flashing yellows are in advance of a fast diverging junction, which doesn't seem relevant to the section of route between Bournville and New Street?
It was the signal in the attached pic, although that was taken after a train had passed and the signal had reverted to red.

EDIT: Just saw this post after having posted the picture

If that proves to be the case then signal SY48 would be the one with a flashing double yellow aspect: That's to the north of Bournville station, which is adjacent to the canal so that would make sense.

That was indeed the signal in question!
 

Attachments

  • 20190619_170811.jpg
    20190619_170811.jpg
    1.2 MB · Views: 92

ForTheLoveOf

Established Member
Joined
7 Oct 2017
Messages
6,416
It was the signal in the attached pic, although that was taken after a train had passed and the signal had reverted to red.
Interesting - so the upgrade allude to by @edwin_m appears to have already been done. Does anyone know when this was done?

With 6 cross-city trains per hour crossing onto the Slow lines and many of them having faster trains close behind, it would be an excellent candidate for a flashing aspect.
I agree, and I'm slightly perplexed why this wasn't done when the area was electrified and the 6tph service introduced. The service pattern now is remarkably similar to that back then.
 

sprinterguy

Established Member
Joined
4 Mar 2010
Messages
11,048
Location
Macclesfield
It was the signal in the attached pic, although that was taken after a train had passed and the signal had reverted to red.

EDIT: Just saw this post after having posted the picture



That was indeed the signal in question!
Ah, excellent, thanks for confirming. A minor mystery solved. :smile:
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,793
Location
Nottingham
I agree, and I'm slightly perplexed why this wasn't done when the area was electrified and the 6tph service introduced. The service pattern now is remarkably similar to that back then.
Electrification was back in the 90s when flashing yellows weren't used so liberally (and wasn't it 4TPH at that time?).
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
15,843
Interesting - so the upgrade allude to by @edwin_m appears to have already been done. Does anyone know when this was done?


I agree, and I'm slightly perplexed why this wasn't done when the area was electrified and the 6tph service introduced. The service pattern now is remarkably similar to that back then.
It would have been done as part of the Cross City re-control from Saltley into the WMSCC a couple of years back. You wouldn't mess with it on its own if you knew that was happening as its not cost effective.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
15,843
The former is rarely used so I'd expect the signal to be for the more frequent divergence at Kings Norton, as a signal that can display more than one flashing aspect isn't allowed.
I think you can if the flashing aspect is different on the signal, ie a double flasher for one route and a single for another. I think that is done at Hitchin.
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,346
I think you can if the flashing aspect is different on the signal, ie a double flasher for one route and a single for another. I think that is done at Hitchin.

No, Hitchin uses a steady YY as the outer signal. (Presuming we’re referring to the consecutive flashing routes on the DF?)

There has been a very recent rules change that now allows that configuration, but it was after the Hitchin remodelling - it was previously banned as top yellow aspect of double yellow signals wasn’t proved lit.
 

sw1ller

Established Member
Joined
4 Jan 2013
Messages
1,567
I think you can if the flashing aspect is different on the signal, ie a double flasher for one route and a single for another. I think that is done at Hitchin.
I know local route knowledge makes up for 99% of all anomalies. But that’s a bit much right?? That would allow for a serious miss read of the signal. I know it’s been refuted by @JN114 but still. Does this happen anywhere? I’d be very surprised if it was.
 

142094

Established Member
Joined
7 Nov 2009
Messages
8,789
Location
Newcastle
There is an interesting set up on Network Rail between Sunderland and Pelaw Junction which is shared by Tyne and Wear Metro trains. On the Down Sunderland after Fellgate, the PSR for Metro units is 80kmh and the junction back onto Metro infrastructure is also 80kmh - but the flashers are provided I assume so that any other stock (i.e. non-Metro) has advance warning that a wrong route has been set.
 

lammergeier

Member
Joined
5 Oct 2017
Messages
506
Just to confirm what has been suggested, the flashing yellows are indeed for the slow lines into Kings Norton and not for Lifford curve, which just has a standard checking down sequence. Never used to be the case but it was introduced during the resignalling works about 18 months ago
I know local route knowledge makes up for 99% of all anomalies. But that’s a bit much right?? That would allow for a serious miss read of the signal. I know it’s been refuted by @JN114 but still. Does this happen anywhere? I’d be very surprised if it was.
Are we talking about consecutive flashing yellows? If so it happens at Bromsgrove now on the Down, again a result of recent resignalling (and to be fair, remodelling.) it's the only location that I know of where it happens, though if course there may be others.
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,346
I know local route knowledge makes up for 99% of all anomalies. But that’s a bit much right?? That would allow for a serious miss read of the signal. I know it’s been refuted by @JN114 but still. Does this happen anywhere? I’d be very surprised if it was.

They wouldn’t have opened up the regulations for no reason - I can’t put my finger on where but I’m sure I’ve seen it in some very recent scheme; I just forget which!

As for mis-read issues, I don’t think it’s a huge issue. Fancy junction signalling arrangements are given a lot of attention and emphasis in route learning materials and assessments. Also I don’t think you’re allowed to FYY - FYY within the same line of route, just that you have 2 consecutive signals that *can* display FYY.
 