sjpowermac
Established Member
- Joined
- 26 May 2018
- Messages
- 1,989
I missed the point at which this became the ‘TPE decide not to introduce Mk5a’ thread...
And to think, I had lots of negative comments about reporting driver training moves and Fault Free Running
I’ve not really followed the 80x trains with any interest, I couldn’t care less about units. Were they delivered on time and without fault to GWR? I know the LNER ones are about a year (?) late and Network Rail have had to engage in some significant signalling work for the trains to operate. I don’t remember reading any comments about 80x being canned when they were late into service ...
And to think, I had lots of negative comments about reporting driver training moves and Fault Free Running
I’ve not really followed the 80x trains with any interest, I couldn’t care less about units. Were they delivered on time and without fault to GWR? I know the LNER ones are about a year (?) late and Network Rail have had to engage in some significant signalling work for the trains to operate. I don’t remember reading any comments about 80x being canned when they were late into service ...