MalaiseForever
Member
Just passed 1F62 running 8 late at Huddersfield. Very impressive looking, and much needed capacity boost. Loco was at Scarborough end.
The signaller assumed that 1E25 was formed as a 185 unit. The driver working 1E25 did not question the platform when offered.Happy to report that ASDO was successful though! Not sure why it was sent onto 12A unless the signaller assumed it was a 185
Agreed, as someone born and brought up in Newcastle... particularly so when said locos sound slightly like Deltics...As someone born and brought up on Merseyside, seeing brand new diesel hauled passenger trains with named locomotives at Lime Street brings a tear to the eye.
I never thought I’d see locos at Lime Street again.
Now we just need the same (with more carriages) for CrossCountry and my life will be complete!
I was going to suggest that, you've beaten me to it!Is it time to update https://www.railforums.co.uk/threads/frequently-requested-diagrams.170615/ yet? or still a bit premature?
They will be, once they get the gremlins out the system, which will happen more there used.Hope the TransPennine 68s are a success.
Loco hauled trains have always been popular.
Due to a fatality between Huddersfield & Slaithwaite 1E39 will now run late via the Calder Valley.
5F48 05:06 Longsight-Manchester Vic
1F48 05:55 Manchester Vic-Liverpool LS
1E25 06:56 Liverpool LS-Scarborough
1F62 10:41 Scarborough-Liverpool LS
1E39 13:56 Liverpool LS-Scarborough
1F76 17:44 Scarborough -Liverpool LS
1J53 20:56 Liverpool LS-Stalybridge
5T53 21:57 Stalybridge-Longsight
I would wait. There will then be more than one 68 running plus 331s on Airedale and Wharfedale services, so more bang for your buck.How reliable is this service? To sample new trains (this one and a 331 between Doncaster & Leeds) I would be willing to spend what would probably be £60+ on a return ticket from London plus West Yorkshire DayRider (train only) ticket to travel on the 1F62 from Leeds to Huddersfield.
The timeframe I have in mind is next week (probably Wednesday). But, to travel all that way and spend all that money and not actually see the new trains will be a shame.
Maybe I should wait for later in the year?
Sad news re Slaithwaite.
I was onboard and the views of the Calder Valley were fantastic! Rare opportunity which couldn't be missed.Due to a fatality between Huddersfield & Slaithwaite 1E39 will now run late via the Calder Valley.
Yes, unless anything chances between now at tomorrow morning!Will the set be in service tomorrow? Hoping to take a ride from Liverpool at some point between 11am and 3pm.
Yes, unless anything chances between now at tomorrow morning!
That's my opinion of the other end as well. Ugly things! The non-loco end still looks as though it's waiting for its cover/cladding yet (well it does when you are used to Pendolinos etc.)Saw a Mark 5A set today. Loco and livery looked really good. Still not sure about the 'non-loco' end mind you.
Love this photo!1E25 06:56 Liverpool Lime Street to Scarborough started at Manchester this morning due to a track defect. 68027 on the ‘Scarborough’ end, seen here leaving York.
View attachment 67908
I see what you are saying as for the foreseeable 68’s will be their loco but could become extra/unnecessary effort when ultimately the benefit of loco hauled coaches is that the loco can be changed more easily to a non-68 alternative thus rendering any efforts to match the design of a specific loco less productive.Could they have got the none loco end to look almost the same as the class 68. Would have made sense.
Thanks! Thankfully on this occasion the geese stayed put!Love this photo!
Top images and completely agree about loco haulage.Yes had a bit of 68027 + Mk5a set TP09 Man Victoria - Lime Street & back today.
The Class 68s are great we already know that from Chiltern & Scotrail.
Quite impressed with the Mk5a vehicles. Not perfect as already mentioned by others but i could do a couple of hours or so on them, no problem.
Anyway it's about time we had some proper loco hauled trains back in the North. Look forward to a proper trip in the future.
View attachment 67938
View attachment 67939
The only improvement I can suggest is a 68 on each end of the train![]()
Many, many moons ago I think it was stated that initially Mk5a would be top and tail, but I think that story was prior to the stock being built!I'm sure that will happen sometime in the future, when the DTs have little hick ups.
Did we ever find out if these sets could work with a Class 68 either end pushing and pulling together.![]()
![]()