Doesn't say what the 9 location schemes required to support Castlefield are and the original report (and options for which 2tph to cut) were seen and discussed behind closed doors. But from elsewhere in the report the schemes seem to have included Salford Crescent (presumably more platforms, junction remodelling), grade separation of Ordsall Lane, a Manchester Victoria Eastern turnback, lengthening of Manchester Airport platforms (possibly involving alteration to the A555 to make room)
Thanks for sending this report to us, the whole thing really does say exactly what we've all been saying!
From the report:
The strategic choices are:
➢ investment in the infrastructure;
➢ some reduction to the train service; or
➢ accept the very poor reliability that is a consequence of using the existing infrastructure so intensively.
Really, it's the iron triangle of project management. We have cost, speed/frequency and quality! Pick two.