Ah ok,Yeah i knew they did low level because of sutton but didn't think they went down from blackfriars.And welwyn drivers are learning sevenoaks and orpington.
Yep 100% as already posted they do the early/late crew changes on the rainham services. They also do a few trips upto bedford/luton and back down.
Also they have booked work into low level, late saturday night and early sunday morning trains.
They need to go somewhere else then sutton i guess lol.
Three bridges are still signing East Grinstead but no booked work over it, got a Q path we can book instead
I believe they still have some booked changeovers at blackfriars, not 100% as my depot only use London Bridge.I think the whole Thameslink section needs some minor edits as crew changes now take place at London Bridge vice Blackfriars after the May' 18 fiasco to prevent the line being blocked.
We just have death by bedford and back on the slows via redhill lol