• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. J

    TPE Mark 5A coaching stock progress

    I think you're referring to the Class 67s there. Class 68s have been designed as 100 MPH mixed traffic locos.
  2. J

    TPE Mark 5A coaching stock progress

    Interesting that there's no mention of ETS. Do they use UK spec ETS?
  3. J

    TPE Mark 5A coaching stock progress

    They look amazing. Does anyone know whether these might see use occasional use on freight like the Chiltern ones do?
  4. J

    DMU v Loco Hauled

    I don't think that a modern loco-hauled trainset has this restriction either. Most European loco-hauled trainsets use driving trailers, rather than DVTs. A driving trailer is essentially a normal passenger carriage with a cab built into one end. An example can be seen here The use of MKIII...
  5. J

    GWR Class 800

    I expect it's been made at Old Dalby Test Track. It's been tested quite extensively there, and has in the last month or two also been undertaking test runs on the ECML.
  6. J

    FGW 57 shortage.

    [Pedant Mode]Remember that the 57/0s are not ETS equipped[/Pedant Mode]
  7. J

    Project Thor / eVoyager

    Yes, I am more than aware that Pendolinos have been extended, and that entire new units have been manufactured a substantial amount of time after the original trainsets were introduced However, in many instances it has been technically impractical or financially prohibitive to build additional...
  8. J

    Project Thor / eVoyager

    True, but how do we address the issue of it being difficult to lengthen the various bespoke DMU and EMU fleets? This is a somewhat prevalent problem, and is likely to become more prolific as ridership increases across the railway.
  9. J

    Project Thor / eVoyager

    None of the points raised in the posts above address the key issue I've been trying to get across though ; If there is a requirement to lengthen a fleet of existing DMUs or EMUs to cater for growth in demand, it can prove expensive, difficult, and in some cases impossible to do so due to the...
  10. J

    Project Thor / eVoyager

    This is one of the key problems with buying multiple unit trains in this country ; it proves to be highly difficult and costly to lengthen existing trains to cater for growth on the route they serve, due to the bespoke nature of each type of train. In some instances irrespective of cost, it...
  11. J

    Hull Trains Problems , Stock Problems

    This is an interesting debate, and I'm not sure which side of the fence I sit on with regard to the Loco-hauled vs MU debate. The In an environment where passenger and freight services are operated by the same organisation, there would possibly be an operational advantage in having locomotives...
  12. J

    UK locos going to be exported abroad

    I wouldn't be at all surprised to see 91s being exported once their work on the ECML has been done.:twisted:
  13. J

    Hull Trains Problems , Stock Problems

    They should hire out 86101 again, though this time with a 67 dragging between Doncaster and Hull ;)
  14. J

    Does anyone think there will be even more new freight locomotives after the class 68?

    It's a shame that the Class 66 couldn't have been designed to run at 100 MPH and be ETS enabled (or at least be capable of having it fitted if required) without compromising on it's heavy haul capabilities. If this had been the case we could have avoided the need for Class 67s and...
  15. J

    Loco-Hauled Class 442s?

    Is there any reason why without appropriate investment and maintenance that Mark III / IV coaches (or Mark III based multiple units) could not continue operating for the next 30-40 years. Although by no means a barometer of passenger rolling stock excellence, Mark I coaching stock seems to be...
  16. J

    chiltern Mk3 DVT generator vans.

    Good pictures in an interesting thread! Will the 67s working the power door sets need retrofitting with door controls? If so, will this preclude other 67s (eg 67018) working for Chiltern?
  17. J

    chiltern Mk3 DVT generator vans.

    Interesting news. Do you know whether the generators will run all the time to replace HEP from the locomotives, or just during station layovers?
  18. J

    Stored mk2s and mk3s.

    I noticed that there were a lot of MKIIs (including some IC swallow liveried examples) in store at Eastleigh works when I attended the open day there two years ago. As there is obviously little perceived need/desire to use them again, why are they being stored? Playing devils advocate, it...
  19. J

    should I give meridians another chance?

    Having travelled between Nottingham and London on several occasions, I'd agree with this statement.
  20. J

    Arriva Trains Wales WAG2 67003

    No you don't. As said previously, the DVTs are retrofitted with AAR control equipment in order to be able to remotely control the 67s. The only modification made to the class 67s is the fitting of remote fire suppression equipment. This has been the case with both the WSMR sets and the...

Top