YorkshireBear
Established Member
- Joined
- 23 Jul 2010
- Messages
- 8,692
Is there a set capacity of bay platforms of stations.
Basically was wondering how many trains platform 1&2 at leeds could take per hour. Im taking this as ignoring trackwork outside station and just treating as 1 line going into 2 bay platforms as an example.
Basically was wondering how many trains platform 1&2 at leeds could take per hour. Im taking this as ignoring trackwork outside station and just treating as 1 line going into 2 bay platforms as an example.