I travelled Southport-Bolton-Man Vic and back today. I was encouraged by what I saw.
1. Several masts have appeared next to and opposite the Tarmac terminal south of Agecroft North Junction. As I hadn't been able so see bases in some locations this leaps from zero to hero.
2. Some masts between Cock Robin bridge and Broughton Road.
3. Several new signals up or lying down awaiting commissioning between Salford Crescent and Clifton. Corresponding reduced numbers of Orangepersons on show, but some still beavering away.
4. Sprinkling of new bases between Salford Crescent and Clifton.
5. Sprinkling of new danglies between Salford Crescent and Bolton.
6. Signalling work near Beaumont Road bridge.
7. Track rationalisation in Bolton station.
8. Uprights for the new footbridge at the south end of Bolton Platforms 4/5 installed.
9. Lots of work in hand at Bolton.
10. Some new Platform 5-to-be track in place in vicinity of Lever St footbridge.
11. Gangs working on the electrical site just east of Lostock Junction.
12. Visible progress on the much-photographed signal opposite Platform 2 at Bolton.
13. Sprinkling of new bases Kearsley to Moses Gate.
14. Most, but not all, masts appear to be in place between Salford Crescent and Central
a) no visible action at the two foot crossings near the M60.
b) serious knotweed problem along substantial stretches of track south of Kearsley and Lostock-Parbold.
Photos later.