3. Report on discussions between the Shrewsbury/Aberystwyth Rail Liaison Committee and the Welsh Assembly regarding the Cambrian Lines and an improved rail service.
3.1 The Secretary gave a full presentation on the current position with regard to the enhanced rail service provision and tourist trains on the Cambrian Coast.
A copy of the presentation is kept on file. (copy available by email upon request)
3.2 The presentation covered the following topics:
The history since July 2013
The survey and results
The recommendations to the Minister
The Implementation Group
3.3 The recommendations to the Minister are as follows:
a) The implementation of the extra morning and evening peak hour trains as set out in the timetables in the report (4 extra trains morning and 4extra trainsafternoon/evening) as soon as possible and no later than May 2015.
b) The implementation of the 1700 Fridays only Coast train from Machynllethto Barmouth extending its journey to Pwllheli each day. This recommendation to be implemented as soon as possible.
c) The introduction of a scenic train service on a trial basis for summer 2014 is supported.
d) To continue the Cambrian Lines Implementation Group to monitor the implementation of the new timetable and take forward the future recommendations to be implemented sometime between 2015 and 2018. Such reports and work to be completed by the Shrewsbury to Aberystwyth Railway Liaison Committee in consultation with the Cambrian Coast Line Liaison Committee.
e) To inform on the station improvements needed as the services on the Cambrian Lines are enhanced.
3.3 A statement from the Minister is expected following a meeting with the Implementation Group.
3.4 A copy of the reports (including that from the Implementation Group) will be posted on the new web site following publication by the Welsh Government. The web site is to be found at
www.shrewsburyaberystwythrailway.org.uk