Hi folks,
Spotted earlier that Chiltern have put out another draft timetable for consultation. Consultation closes 26th February.
Met Line times are much the same as now, but the Western has been completely recast to take advantage of the Mainline works (aka Evergreen 3 Phase 1).
The basic off-peak pattern from Marylebone will be:
Cheers,
Barry
Spotted earlier that Chiltern have put out another draft timetable for consultation. Consultation closes 26th February.
Met Line times are much the same as now, but the Western has been completely recast to take advantage of the Mainline works (aka Evergreen 3 Phase 1).
The basic off-peak pattern from Marylebone will be:
- xx.07 - Birmingham Snow Hill (Fast to High Wycombe, then Bicester North, Banbury, etc)
- xx.10 - Bicester North/Banbury (Fast to High Wycombe)
- xx.13 - Princes Risborough/Bicester North (Fast to Gerrards Cross)
- xx.16 - High Wycombe
- xx.37 - Birmingham Moor Street (Fast to Banbury)
- xx.40 - Bicester North (Fast to Gerrards Cross, connects with Aylesbury shuttle at Princes Risborough)
- xx.43 - High Wycombe
Cheers,
Barry