Class 345 progress

Status
Not open for further replies.

The_Train

Established Member
Joined
2 Jun 2018
Messages
4,363
7 car 345002 now at Crewe. I believe the 1st 7 car to head over there.

Mileage Accumilation testing on the mainline. Usually a sign that it's a month or so away from delivery to Old Oak Common or Ilford. Hopefully 345001 will follow.

Anyone have any inside information as to when 345002 might come out to play? Can't see that anything has worked the 1529 test path from Crewe to Rugby in some time now
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Jonny

Established Member
Joined
10 Feb 2011
Messages
2,562
Mileage Accumilation testing on the mainline. Usually a sign that it's a month or so away from delivery to Old Oak Common or Ilford. Hopefully 345001 will follow.

How much mileage would it be expected to accumulate?
 

EE Andy b1

Established Member
Joined
12 Dec 2013
Messages
1,212
Location
CLC
I was just shown a photo yesterday, It was at Liverpool Street station I believe of a Class 345 that had hit the buffers and the cab front all lifted. Not sure when this happened.
Does anyone have any info at all?
 

rebmcr

Established Member
Joined
15 Nov 2011
Messages
3,851
Location
St Neots
I was just shown a photo yesterday, It was at Liverpool Street station I believe of a Class 345 that had hit the buffers and the cab front all lifted. Not sure when this happened.
Does anyone have any info at all?

If it's the one I remember, it was at Old Oak depot not long after the first 345s arrived West.
 

EE Andy b1

Established Member
Joined
12 Dec 2013
Messages
1,212
Location
CLC
If it's the one I remember, it was at Old Oak depot not long after the first 345s arrived West.
Ah right ok, thanks, so it was a while back. The person with the photo didn't have much detail but a side on photo showed the cab front shoved up quite a bit. Had not seen it before.
 

Unclepete

Member
Joined
18 Oct 2011
Messages
76
Location
Newbury
Sorry if this has been asked before, but wasn't there supposed to be 9-car workings by now on the western side to H&H, or have I missed it being introduced?
 

iphone76

Member
Joined
6 Nov 2010
Messages
917
Location
South Essex
Sorry if this has been asked before, but wasn't there supposed to be 9-car workings by now on the western side to H&H, or have I missed it being introduced?

No - you haven't missed it. Hopefully from sometime in January 2019 when the 7 car 345s will return to the East side and replace more 315s.
 

Buggleskelly

Member
Joined
28 Jun 2017
Messages
93
Location
Bishops Wallop
Sorry if this has been asked before, but wasn't there supposed to be 9-car workings by now on the western side to H&H, or have I missed it being introduced?

I take it these units will be rebranded as TFL Rail, as I think I read further up on this thread that all 9 car units have Elizabeth Line branding on. By the way, when will the east side see 001/2 and 004 in service?
 

700007

Established Member
Joined
6 May 2017
Messages
1,195
Location
Near a bunch of sheds that aren't 66s.
I take it these units will be rebranded as TFL Rail, as I think I read further up on this thread that all 9 car units have Elizabeth Line branding on. By the way, when will the east side see 001/2 and 004 in service?
001 and 004 are expected to be 9 cars and won't be until the Liverpool Street remodelling or the central section and East section are joined up, whichever is first. 002 is expected to be in service some time soon as a 7 car but don't know when.
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
10,034
Location
here to eternity
I've just gone past OOC class 345 depot and there appears to be a set with its leading vehicle (western end) at an angle pointing slightly upwards as if it has derailed. Can anyone provide any further info?
 

TFN

Member
Joined
17 Aug 2017
Messages
355
Location
London
I've just gone past OOC class 345 depot and there appears to be a set with its leading vehicle (western end) at an angle pointing slightly upwards as if it has derailed. Can anyone provide any further info?

Just seen it again at 1533. A lot of orange hivis around. Doesn't look good :/
 

TRAX

Established Member
Joined
2 Dec 2015
Messages
1,647
Location
France
Just to make sure, in the west the 345s only run from Paddington to Hayes & Harlington is that right ? Or do they venture further west ?
 

Trailfinder

Member
Joined
15 Jan 2015
Messages
84
They also run to Reading on test / training runs. I watched one depart OOC for Reading on OTT yesterday.
 

TRAX

Established Member
Joined
2 Dec 2015
Messages
1,647
Location
France
Oh I’m sorry I didn’t mention that I was asking just for passenger services.
 

A7rud

Member
Joined
16 Aug 2016
Messages
340
Location
Edinburgh
Is it possible to view any class 345s on shed, from Old Oak Common Lane? If so, can any be ID'd with or without binoculars?
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
19,278
Location
West of Andover
Should be all 11 diagrams by the May timetable change. It has been stepped up from 8 to 9 since the last change in December.

I guess when the full length units eventually come into use on the western side, the 2/3 reduced length units can head back over to the east to allow the 345s to operate most services at weekends & off-peak, with the 315s coming out during peak time?
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,947
Location
East Anglia
I guess when the full length units eventually come into use on the western side, the 2/3 reduced length units can head back over to the east to allow the 345s to operate most services at weekends & off-peak, with the 315s coming out during peak time?

Weekends all services can be 345s. Monday to Friday the 345s are targeted at the heaviest loading peak services, to help reduce dwell times and improve punctuality. That means they aren’t always in the right place to work all the off peak services, as the platform working at both Livetpool St and Shenfield dictates what forms what.
 
Last edited:

700007

Established Member
Joined
6 May 2017
Messages
1,195
Location
Near a bunch of sheds that aren't 66s.
Weekends all services can be 345s. Monday to Friday the 345s are targeted at the heaviest loading peak services, to help reduce dwell times and improve punctuality. That means they aren’t always in the right place to work all the off peak services, as the platform working at both Livetpool St and Shenfield dictates what forms what.
Indeed this - although the timetable itself generally remained untouched at the December timetable change, it was mostly to do with changing around what train during the PM peak was a 315 and what was a 345.

On the old timetable, majority of the 345s had been booked to do trains leaving London Liverpool Street after the 1800 departure I think it was however many customers complained that too many of the departures, particularly during the summer where they wanted a train with AC, were 315s between 1700 and 1800 (of the 15 departures during this time I think only 3 trains were 345s or something like that?). Now especially after 1730 a lot more trains have been converted to 345 operation however this has meant other trains outside of these times have been reverted back to 315 operation.

As someone who enjoys class 315s this is obviously welcome news as a lot of the trains I get have converted back from 345s to 315s! (Yay :D)
 