This GWR notice says that the stabling sidings aren't required until the second phase of operations "later in the summer".
I suggest 'later in the summer' is July 3rd. This is by reference to the dated alterations in the passenger timetable, and use of the stabling sidings is shown from then on realtimetrains.
Some of the intended DMU short workings from the west as far as Maidenhead also use the stabling sidings.