I believe I was talking about 458s, not 455s. And about internal care, not repaints. Maybe it doesn't seem fair to you, but there have been enough comments on here and elsewhere about the lack of TLC with the 458s. And its the view of plenty of staff as well as others.

I know,I was just remarking how nice the 455's look.

Presumably SWT are satisfied with the internal condition as they wouldn't have accepted delivery. Also, given that Wimbledon hasn't bothered with the internal condition of the 458s for the past 15 years, I doubt they're going to start now.

Also I was remarking on your comment and disagree given Wimbledon do a very good job and I have a failure about every two years.Why the haven't done the internal I don't know,perhaps they don't specialise in it on 458's (Actually I thought Bournemouth or somewhere else would do it).I haven't seen the later units anyway but if they are bad I will and try and find out why.

It also seems they are more interested in getting these units up and running them in service first as they are well late and we are short of units at times.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
11,855
I know,I was just remarking how nice the 455's look.



Also I was remarking on your comment and disagree given Wimbledon do a very good job and I have a failure about every two years.Why the haven't done the internal I don't know,perhaps they don't specialise in it on 458's (Actually I thought Bournemouth or somewhere else would do it).I haven't seen the later units anyway but if they are bad I will and try and find out why.

It also seems they are more interested in getting these units up and running them in service first as they are well late and we are short of units at times.

No worries, lets agree to disagree. On the webchat today they said that the first unit shouldn't have gone into service without a clean and this will be done asap.
 

hassaanhc

Established Member
Joined
5 Jan 2014
Messages
2,216
Location
Southall
That doesn't seem fair.I thought they were "freshened" up at Bournemouth.I think Wimbledon do a very good job on their trains.Who keeps painting these 455's? They look lovely.



Saw 502 being shunted about Wimbledon (under it's own power) just after 1330 so it does actually move.;)

It might be alive, but is it well enough to enter service? :P
Once again a unit short today.

The other day SWT said on Twitter that weekend services on Weybridge/Woking via Hounslow and Hounslow loop will continue to use single Class 455 units.
 

Juniper Driver

Established Member
Joined
17 Jul 2007
Messages
2,108
Location
SWR Metals
No worries, lets agree to disagree. On the webchat today they said that the first unit shouldn't have gone into service without a clean and this will be done asap.

Well that's fair enough..What were they? Covered in dust?

If so you are obviously correct that they should have had a clean first.:(

It might be alive, but is it well enough to enter service? :P

No,I think it is unwell.So would you be if you'd had major work done.;)
 
Last edited:

arty762

Member
Joined
9 Jun 2012
Messages
90
Location
Dorking, Surrey
It might be alive, but is it well enough to enter service? :P
Once again a unit short today.

The other day SWT said on Twitter that weekend services on Weybridge/Woking via Hounslow and Hounslow loop will continue to use single Class 455 units.

502 has been out with a brake fault , it was out on road beside bogie drop coupled to 501 .
 

arty762

Member
Joined
9 Jun 2012
Messages
90
Location
Dorking, Surrey
So...to our inside man...What is this about dirty interiors,Arty?

as far as i can see very little has been done to the interiors of our returning units , hence the blue first class seating remaining , which i think looks hideous, they must have done some work though as 501 still has plastic wrap on some of the seating , but i think in the rush to get units back they are cutting corners , 501 came back only half completed, the wabtec guy's are finishing it off here.
 

Manchester77

Established Member
Joined
4 Jun 2012
Messages
2,628
Location
Manchester
Is it still expected to be complete by May 15? Because realistically if each set takes so long to be fully ready, even with stuff not complete upon arrival at Wimbledon, I'd I were SWT aid want to gradually ease them into service for December 2015 that way any faults with ASDO and the 459s themselves can be sorted.
 

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
Below are the current, up to date, details about the 458/5 fleet. Someone might find it useful.

Unit no - Confirmed carriage formation - Location and status - Wimbledon delivery date

458501 - 67701, 74101, 74001, 74431, 67601 - Wimbledon testing - 16/08/2014
458502 - 67702, 74102, 74002, 74421, 67602 - In Service - 12/07/2014
458503 - 67703, 74103, 74003, 74441, 67603 - Wimbledon testing - 18/09/2014
458504 - 67704, 74104, 74004, XXXXX, 67604 - Doncaster rebuild -
458530 - 67730, 74130, 74030, XXXXX, 67630 - Doncaster rebuild -
458531 - 67913, 74418, 74446, 74458, 67912 - In Service - 22/10/2013
458532 - 67904, 74417, 74447, 74457, 67905 - In Service - 28/07/2014
458533 - 67917, 74413, 74443, 74453, 67916 - In Service - 18/01/2014
458534 - 67914, 74414, 74444, 74454, 67918 - In Service - 21/09/2013
458535 - 67915, 74415, 74445, 74455, 67911 - In Service - 21/03/2014
458536 - Carriage formation unconfirmed - Doncaster rebuild -
 

Juniper Driver

Established Member
Joined
17 Jul 2007
Messages
2,108
Location
SWR Metals
as far as i can see very little has been done to the interiors of our returning units , hence the blue first class seating remaining , which i think looks hideous, they must have done some work though as 501 still has plastic wrap on some of the seating , but i think in the rush to get units back they are cutting corners , 501 came back only half completed, the wabtec guy's are finishing it off here.

Yeah,that sounds about right although I haven't been near those units recently as desiro's (and 455's) are taking up my time.:p

Noticed at least four units at Wimbledon Sheds @ approx 1210.
 
Last edited:

HarleyDavidson

Established Member
Joined
23 Aug 2014
Messages
2,544
Last night when I was passing on my many trips up & down to Waterloo, both 501 & 502 were coupled up outside the inspection shed.
 

HarleyDavidson

Established Member
Joined
23 Aug 2014
Messages
2,544
Personally I'd keep those coaches in storage,because if any of the other were to receive significant accidental damage you could always use one of those.

I mean look at that 455 that had a cement mixer interface problem at Oxshott. It was almost certainly destined for withdrawal,but they found a coach from a 210 unit and its now back in service.
 

Juniper Driver

Established Member
Joined
17 Jul 2007
Messages
2,108
Location
SWR Metals
Personally I'd keep those coaches in storage,because if any of the other were to receive significant accidental damage you could always use one of those.

I mean look at that 455 that had a cement mixer interface problem at Oxshott. It was almost certainly destined for withdrawal,but they found a coach from a 210 unit and its now back in service.

Yeah but storing them to rust like that VEP in Clapham Yard is not good.:-x
 
Last edited:

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
Think 458020 is off on Tuesday.

Ignore that actually, sorry. It's 4Z47 on Tuesday, 47 and barriers from Wimbledon to Wabtec. Could be the same barriers that brought down 458503, in which case another 458/5 may need delivering from Wabtec.
 
Last edited:

WWTownEnth

Member
Joined
21 Mar 2014
Messages
241
Both trains on the Hounslow loop / Weybridge via Putney routes this morning were in short formation (5 instead of 10 cars).

What is going on with these things?
 

HarleyDavidson

Established Member
Joined
23 Aug 2014
Messages
2,544
A lot of head scratching in Wimbledon Park depot! I know that they've got two in the sheds for testing, remedial work & "static" train crew training.
 
Status
Not open for further replies.

Top