Creation of class 230 DEMUs from ex-LU D78s by Vivarail

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Neen Sollars

Member
Joined
21 Jul 2018
Messages
326
Sorry that you are troubled in this way. Briefly, four years have elapsed, in which time all the total project overheads (do I have to tell you what this word means?) have had to be paid with little or naught in the way of sales monies in return.
PS. The very first post on this thread mentioned 75 trains as being a possible order for the 230`s from Northern. Perhaps Vivarail were targeting that as a potential order for 75 x 3 car DEMU 230`s? That potential order clearly did not materialise. As you say project going for four years no 230`s yet in service. However Vivarail have stated that the market is moving towards electric trains and about 18 months into the project Vivarail put a lot of effort into developing the 230 BEMU. Latest videos on you tube show it in test running and the company say it is now ready to order. The latest Vivarail press release is not about cake it is dated 13/12/2018 about a tie up with a battery developer to keep improving the 230 BEMU which have been designed for ease of switching power packs onto the vehicle. So in four years Vivarail have developed a DEMU and a BEMU and both are available for sale. They appear to have very patient backers who as you state may be able to offset losses here elsewhere. If the project fails they appear to have the option to scrap the 400 or so units for a total of around £3.7 million. That would assist in recovering the overheads expended. Also note that Vivarail are attempting to protect the intellectual property rights of what they are developing by filing patents, as another poster has already stated such a move could hold future value for the company.
 

Neen Sollars

Member
Joined
21 Jul 2018
Messages
326
And the best English uses short words and short sentences unless longer words are necessary.
PS. I note you are in your 70`s and a retired businessman, and probably retired due to ill health? I also note Adrian Shooter is 70 is a serial entrepreneur who has had a lot of success and few unsuccessful ventures. You appear not to like him, have you met him in a previous business life and fallen out? I think upcycling the D78s into 230s is a fantastic idea and I wish the project well. The finished trains external and internal look great. I do not like the whine of the 230 BEMU at low speed, however that appears to fade as the train attains speeds of 25 mph plus
take a look and listen to
Speed of up to 40 mph here? I am sure that Vivarail will try to improve the BEMU in all performance aspects in the future.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
97,896
Location
"Marston Vale mafia"
The whine is typical of a good many three phase drives, and tends to be a lot less obtrusive in real life than it sounds when recorded on a mobile phone or video camera.
 

TT-ONR-NRN

Established Member
Joined
30 Dec 2016
Messages
10,480
Location
Farnham
Overall I’m pretty impressed at how far this train has come.
 
Last edited by a moderator:

sw1ller

Established Member
Joined
4 Jan 2013
Messages
1,567
Wouldn’t wanna get my hand trapped in the doors. No mercy given there eh! Interesting video.
 

philthetube

Established Member
Joined
5 Jan 2016
Messages
3,762
Many on this website, including the forum staff, have been aware of an unfortunate side-effect of the stroke that I suffered in July 2012 at the age of 67, which meant that my cognitive reasoning ability was affected and when in print, I have a tendency to write in a way that my brain thinks that I should express my thoughts. Before that unfortunate event, I prided myself on having a good command of the English language.

Sorry to hear this, hope I do not offend you by suggesting that when you write a post you leave it five minutes read it again and then post.

From family experience I know that doing things like that can aid recovery as it forces the brain to work around it's issues.

Apologies if you feel I am sticking my nose in where not wanted.

NOW BACK TO TOPIC.
 

sw1ller

Established Member
Joined
4 Jan 2013
Messages
1,567
I asked this when the images first came out but I was told it was just an artists impression.

Does anyone know what that yellow button is/was for next to the DSD? It’s just visible in the video above. I’m just curious.
 

HLE

Established Member
Joined
27 Dec 2013
Messages
1,405
I asked this when the images first came out but I was told it was just an artists impression.

Does anyone know what that yellow button is/was for next to the DSD? It’s just visible in the video above. I’m just curious.

Haven't seen the video but passcom override would be my guess.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,719
Location
North
Eh? These units aren't going to run to Oxford. They are going to run between Bletchely and Bedford on local services until E-W pays out. Then I expect the local service to be included in whichever operator takes the E-W route. We should then get a newer unit with selective door controls. The reason these trains are needed is to allow the 3 x 150's ( and some 153's?) to move to northern land meaning LNWR have nothing suitable to run these services. Perhaps they should just give up and we can all walk to work? What is your solution for this issue. Shall we cancel the unit transfers to Northern where I suspect they are badly needed? LNWR really need 4 x 150 so which Northern services shall we not enhance? Your call. I am very happy to keep the 150. Remember this line is a diesel island in an electric sea. It is always going to be a micro fleet.

BTW at what point between Bedford and Bletchley does a unit stopping every half inch exceed 60 mph? Perhaps you could tell me. I know the answer but wonder if you do.

BTW 2 - the Vale is maintained to a higher speed than 60 and has some decent quality track work .
Travelled on the route once and that was before Bedford- Cambridge closed so can't remember line let alone station and level crossing frequency

Why maintain such a short route to a higher line speed limit if trains can't reach that speed in day to day operating. Bonkers. Harrogate line is maintained to 60/65mph but running trains capable of 100/125 mph that could run at 80/90 between stations as 99% of the track is cwr on concrete sleepers and deep ballasted and 90mph signalling spacing and sighting. Equally bonkers.

I think you should keep your 150s. You are welcome to them after experiencing 170s on my local line and I am sure Northern could spare 3 or 4. They have 156s, 158s and 170s cascaded from Scotland coming out of their ears at the moment with 195s and 769s to come. Although having said that, the 150 refurbs are acceptable but not great.

Why not have the 3 150/0 units and keep them together and will give you capacity in the peaks being 3-car.
 

bspahh

Established Member
Joined
5 Jan 2017
Messages
1,736
Agreed, I fail to see the point of using an unnecessary long word when a diminutive one will do.
What about a short one?

The advantage for LNWR with a 230 is that they will get an off peak return ticket from me. If they stuck with Sprinters, I don't think I would bother.
 

mmh

Established Member
Joined
13 Aug 2016
Messages
3,744
Because the branch can't support trains longer than 80m due to signal/level crossing positioning, which is the whole reason they aren't using Class 170/172! :)

Eh? You can't use 3 car 150s (approx 60m), or 2 or 3 car 170/172s (approx 47m/70m), because the line can't take trains longer than 80m? That's a bit confusing.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,719
Location
North
Eh? You can't use 3 car 150s (approx 60m), or 2 or 3 car 170/172s (approx 47m/70m), because the line can't take trains longer than 80m? That's a bit confusing.
Congratulations, I am confused but mainly why a secondary route can only take short formation trains.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
29,306
Location
Fenny Stratford
Why maintain such a short route to a higher line speed limit if trains can't reach that speed in day to day operating. Bonkers. Harrogate line is maintained to 60/65mph but running trains capable of 100/125 mph that could run at 80/90 between stations as 99% of the track is cwr on concrete sleepers and deep ballasted and 90mph signalling spacing and sighting. Equally bonkers.

It isnt maintained to a higher standard for us passengers! I think it is now 75 mph and it is at that level for freight. We have a heavy stone train several times a week plus whatever else turns up.

I think you should keep your 150s. You are welcome to them after experiencing 170s on my local line and I am sure Northern could spare 3 or 4. They have 156s, 158s and 170s cascaded from Scotland coming out of their ears at the moment with 195s and 769s to come. Although having said that, the 150 refurbs are acceptable but not great.

Why not have the 3 150/0 units and keep them together and will give you capacity in the peaks being 3-car.

because a three car 150 wont fit in the majority of the platforms due to platform lengths, signal positions and level crossings. That is also why we cant have a 170 or 172. The only trains that will fit are 2 car 150's 1 x 153 ( unsure if 2 x 153 will fit) Pacers ( again unsure if a double pacer would fit) or 230's. We couldn't even take the top and tailed 31's and 2 carriages these days!

Also no one will pay to extend platforms or move signals until E-W rail arrives. We as mere passengers would be very happy to have 3 x 150's for our line. However i am sure they can do more good in Northern land.

The advantage for LNWR with a 230 is that they will get an off peak return ticket from me. If they stuck with Sprinters, I don't think I would bother.

thanks for visiting our line. Don't sit in my seat....................

Congratulations, I am confused but mainly why a secondary route can only take short formation trains.

See above.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
97,896
Location
"Marston Vale mafia"
You could 60 years ago. What's changed?

A number of the platforms have been moved the other side of the level crossing (with associated signalling changes) so that the crossing doesn't have to remain closed while the train is standing at the platform. This was done on the cheap.

Think he meant 40m...

I did, sorry.

because a three car 150 wont fit in the majority of the platforms due to platform lengths, signal positions and level crossings. That is also why we cant have a 170 or 172. The only trains that will fit are 2 car 150's 1 x 153 ( unsure if 2 x 153 will fit) Pacers ( again unsure if a double pacer would fit)

2 x 153 won't fit (and so a double Pacer won't either as that would be 2x32m, though a single one would probably do the job fine), there was a discussion about using only 153s (with the toilets removed), but if they had they would have had to increase the frequency at certain times of day as a single one is inadequate for the school trains, which would have broken the Takt.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,719
Location
North
A number of the platforms have been moved the other side of the level crossing (with associated signalling changes) so that the crossing doesn't have to remain closed while the train is standing at the platform. This was done on the cheap

Tinkering to improve the lot of the car driver always buggers up the lot of the rail user.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
29,306
Location
Fenny Stratford
Tinkering to improve the lot of the car driver always buggers up the lot of the rail user.

they aren't trying to help motorists. They are helping the railway. Note the complaints in villages like Liddlington about the proposed mitigation!

2 x 153 won't fit (and so a double Pacer won't either as that would be 2x32m, though a single one would probably do the job fine), there was a discussion about using only 153s (with the toilets removed), but if they had they would have had to increase the frequency at certain times of day as a single one is inadequate for the school trains, which would have broken the Takt.

nor are the 153's suitable for carrying bikes - they are one of the main reasons for delays as people have to manipulate their bikes around the 90 degree narrow turn at the ends and through the narrow doors. We are a rural branch line so quite a few people cycle to the stations
 

HLE

Established Member
Joined
27 Dec 2013
Messages
1,405
Should ban bikes on the dogbox unless they're fold up. Happens up here too, cue 15 passengers having to detrain just to let a bike off/on!
 

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
The whine is typical of a good many three phase drives, and tends to be a lot less obtrusive in real life than it sounds when recorded on a mobile phone or video camera.
You're right about that but even so, knowing what the D78 sounded like in its original guise, there's no hiding that is one noisy traction inverter, probably the noisiest I've encountered outside a Velaro, which you can forgive a bit more as they are much more soundproofed inside and are capable of near enough 200mph. In this case, it just sounds cheap. Not a problem in of itself, but I genuinely think that'd be quite unpleasant when travelling on these units - internal footage shows it's very clearly audible inside too. Given the use case of these units, you don't get away with the reduction in noise at high speed that mitigates this issue on the 800s, you'll be hearing it a lot on the Marston Vale and probably most other routes the 230s may end up on. In my humble opinion, that could do with some work to be made a little quieter. It's not a dealbreaker for using the trains at all, but it's a disappointing flaw I think, in what otherwise looks like a genuinely neat engineering solution.
 