As we know, most planned enhancements for the December 2020 Timetable have been deferred or cancelled.
This thread is to discuss news and plans as they're announced for what will form the permanent basis. This is expected to roll over many things from the May 2020 base timetable. Minor tweaks and changes are likely, there may also be some services eliminated.
To discuss timetables for engineering work at London King's Cross please see this thread https://www.railforums.co.uk/threads/kings-cross-upgrade-closures-2020.206605/. Discussion of temporary timetables in effect as a result of Covid-19 is underway elsewhere in this forum, there are also a number of threads in the Speculative Ideas (https://www.railforums.co.uk/forums/speculative-ideas.172/) section discussing timetable changes.
Thank you.
This thread is to discuss news and plans as they're announced for what will form the permanent basis. This is expected to roll over many things from the May 2020 base timetable. Minor tweaks and changes are likely, there may also be some services eliminated.
To discuss timetables for engineering work at London King's Cross please see this thread https://www.railforums.co.uk/threads/kings-cross-upgrade-closures-2020.206605/. Discussion of temporary timetables in effect as a result of Covid-19 is underway elsewhere in this forum, there are also a number of threads in the Speculative Ideas (https://www.railforums.co.uk/forums/speculative-ideas.172/) section discussing timetable changes.
Thank you.