    I did wonder about that, but the shuffle would also be difficult if the wires stop at the western end of the platforms and the easternmost cab wasn't useable.
     
  2. swt_passenger

    swt_passenger Veteran Member

    Messages:
    17,637
    Joined:
    7 Apr 2010
    West. As mentioned in the original post about this, #7739
     
  3. JN114

    JN114 Established Member

    Messages:
    1,331
    Joined:
    28 Jun 2005
    I thought Brickyard was being wired? That would enable the London End unit to run round it’s train via East End and Brickyard onto the Swansea end of its train.
     
  4. swt_passenger

    swt_passenger Veteran Member

    Messages:
    17,637
    Joined:
    7 Apr 2010
    I think edwin_m was replying to a suggestion that the wiring wasn’t needed, made by previous poster themiller.
     
  5. edwin_m

    edwin_m Veteran Member

    Messages:
    13,235
    Joined:
    21 Apr 2013
    Location:
    Nottingham
    I missed the point about Brickyard sidings in my comment about run-round. Having found them on the Quail map they're on the north side west of the station, so could be used to facilitate run-round from a low-numbered platform. Whether this is possible from a high-numbered plaform depends on how much of the western throat is electrified. I'm not sure if they still contain a loop and if so whether run-round would be possible within the sidings rather than blocking a platform which would be even more of a problem during special events.
     
  6. JN114

    JN114 Established Member

    Messages:
    1,331
    Joined:
    28 Jun 2005
    Platforms 0-4, the two through roads and all lines and connections at Cardiff West - including Brickyard sidings - are to be electrified. The limit of electrification I understand is just short of Leckwith Loop Junction.

    If it got so bad that a 387 would need to run round it’s train, blocking a platform for 5 minutes during an event while it happens really won’t be the end of the world.

    That said in a couple of years of being a GWR Info Controller and now a few months of service controller for the LTV fleet I’ve yet to see the 387s suffer an issue where we’ve had to box a cab in out in the wild - it’s more likely the techs on the depot discover an issue and put a multi-only restriction on the unit. Non-Multis are much more common.
     
  7. jimm

    jimm Established Member

    Messages:
    4,096
    Joined:
    6 Apr 2012
    Why? If it is a sports fixture or concert - the usual kind of thing that happens in the stadium - there will be a period between extras arriving and the time they depart to take people home afterwards, which should allow ample opportunity for shunting to put a faulty cab in the middle of a formation. And that's in the extremely unlikely event such a manoeuvre should be required in the first place.
     
  8. Thatcham Xing

    Thatcham Xing Member

    Messages:
    109
    Joined:
    1 Nov 2016
    Another update from a look about an hour ago. Overhead power lines now down (last of the poles being pulled out of the ground when I passed) and looks like the OHLE wires pretty-much up across Kennet Viaduct.
     
  9. edwin_m

    edwin_m Veteran Member

    Messages:
    13,235
    Joined:
    21 Apr 2013
    Location:
    Nottingham
    That assumes they identify the faulty cab well before someone climbs in to start using it.
     
  10. jimm

    jimm Established Member

    Messages:
    4,096
    Joined:
    6 Apr 2012
    :rolleyes:
     
  11. 59CosG95

    59CosG95 Established Member

    Messages:
    2,649
    Joined:
    18 Aug 2013
    Location:
    WIM/PBO
    Am I right in guessing that P6 & P7 won't be electrified as part of GWEP, as they're part of the Valley Lines Electrification remit?
     
  12. JN114

    JN114 Established Member

    Messages:
    1,331
    Joined:
    28 Jun 2005
    That’s my understanding- but only from reading between the lines of the various works undertaken and planned.
     
  13. 3973EXL

    3973EXL Member

    Messages:
    310
    Joined:
    2 Feb 2017
    Contact wires at Theale east are now up.
    DSC01527.JPG DSC01528.JPG DSC01529.JPG DSC01531.JPG

    Also at Theale the barriers to the platform extensions have been removed.
     
    Last edited: 11 Oct 2018
  14. 59CosG95

    59CosG95 Established Member

    Messages:
    2,649
    Joined:
    18 Aug 2013
    Location:
    WIM/PBO
    That should mean that all the wires on the B&H are now up! *pops champagne cork*
    AIUI, the last remaining works are
    • Reading West Platform extensions
    • Aldermaston Platform extensions
    • Tilehurst Rd Bridge parapet works.
    It's looking very good indeed!
     
  15. deltic08

    deltic08 Established Member

    Messages:
    1,790
    Joined:
    26 Aug 2013
    Location:
    Ripon
    Only the bridge parapet works holding up energisation then?
     
  16. 59CosG95

    59CosG95 Established Member

    Messages:
    2,649
    Joined:
    18 Aug 2013
    Location:
    WIM/PBO
    And platform extensions. I'm not sure how far works have progressed on the new substation at Boundary Rd (between Newbury's stations), but it seems to be going quite well.
     
  17. JN114

    JN114 Established Member

    Messages:
    1,331
    Joined:
    28 Jun 2005
    Platform Extensions have no bearing on energisation
     
  18. Thatcham Xing

    Thatcham Xing Member

    Messages:
    109
    Joined:
    1 Nov 2016
    I understood that the platform extension (there is only 1, on the down side) at Aldermaston is complete? Will try to pop by for a look.
    As are those at Thatcham - will also go for a look.
    As far as I know, Tilehurst isn't on the B&H :lol:
     
  19. 3973EXL

    3973EXL Member

    Messages:
    310
    Joined:
    2 Feb 2017
    I would concur that Aldermaston has been complete for sometime.

    Tilehurst Rd bridge is on the B&H, between Reading West and the A4 Bath Rd bridge.

    Some new signs on the country end of Reading West platforms.
    DSC01526.JPG
     
  20. deltic08

    deltic08 Established Member

    Messages:
    1,790
    Joined:
    26 Aug 2013
    Location:
    Ripon
    But Tilehurst Road bridge is!
     
  21. reddragon

    reddragon Member

    Messages:
    420
    Joined:
    24 Mar 2016
    Location:
    Churn (closed)
    Tilehurst Road bridge wasn't finished last night - work still ongoing
     
  22. swt_passenger

    swt_passenger Veteran Member

    Messages:
    17,637
    Joined:
    7 Apr 2010
    That sign about “access beyond this point etc” doesn’t seem normal in public areas.
     
  23. alxndr

    alxndr Member

    Messages:
    436
    Joined:
    3 Apr 2015
    I've seen similar on access gates, I suspect it was just easier to put there rather than on the limited room on the gate at the end of the platform. Not a sign for the public, just happens to be in a public place.
     
  24. swt_passenger

    swt_passenger Veteran Member

    Messages:
    17,637
    Joined:
    7 Apr 2010
    Are they really saying it’s dangerous for staff to walk in the cess?
     
    Last edited: 11 Oct 2018
  25. Thatcham Xing

    Thatcham Xing Member

    Messages:
    109
    Joined:
    1 Nov 2016
    Yes, of course, reader error.

    Didn't have a look at Aldermaston (platforms still closed this evening), but a drive-past at Thatcham confirmed that the platform extensions look ready for use (Heras fencing blocking-off the extensions is gone)

    Granted that "platform extensions have no bearing on energisation" but was thinking people would be interested in progress on this aspect of the capacity increases that the new electric and hybrid trains will bring on the B&H.
     
  26. 59CosG95

    59CosG95 Established Member

    Messages:
    2,649
    Joined:
    18 Aug 2013
    Location:
    WIM/PBO
    Indeed, my reasoning on their inclusion of the extensions in the wiring update was that the work was being done concurrently, and that people might want to use the list as a guide to find out why the work was going on.
     
  27. ArchieWoodbine

    ArchieWoodbine Member

    Messages:
    118
    Joined:
    9 Nov 2017
    Those signs are actually planned to be removed for that very reason, I'm told. They're misleading to the public and factually incorrect for staff accessing the cess, so there's been quite a few complaints regarding them floating about.
     
  28. Mintona

    Mintona Established Member

    Messages:
    2,905
    Joined:
    8 Jan 2006
    Location:
    South West
    Not sure if it’s been posted, I don’t recall seeing it but it may have been done.

    The OLE is being energised at 25000v AC between the existing limit of electrification at Southcote Junction and Newbury, and must be considered live at all times from 0650 on Sunday 21 October 2018.
     
  29. swt_passenger

    swt_passenger Veteran Member

    Messages:
    17,637
    Joined:
    7 Apr 2010
    It was actually mentioned in post #7706, in a reply to your earlier post about getting to Southcote Jn.
     
  30. GRALISTAIR

    GRALISTAIR Established Member

    Messages:
    2,822
    Joined:
    11 Apr 2012
    Location:
    Dalton Georgia USA
    Indeed
     