3973EXL
Established Member
- Joined
- 2 Feb 2017
- Messages
- 2,447
B&H photo updates, Reading West.
Tilehurst Rd bridge now single file controlled by lights.
Reading West platform extension to finish.
Theale, Aldermaston & Thatcham all open.
Looks to still be some snagging on the overheads.
Signs up both ends of the platforms. Also at other stations with a smaller versions noted at Newbury.
For those who like to ponder on things, how long before any of the following change?
Remains of the old footbridge with OFF indicator.
Temporary cable bridge.
Temporary looking access to Oxford Rd on the down side.
Probably all dependant on what happens about a footbridge!
Tilehurst Rd bridge now single file controlled by lights.
Reading West platform extension to finish.
Theale, Aldermaston & Thatcham all open.
Looks to still be some snagging on the overheads.
Signs up both ends of the platforms. Also at other stations with a smaller versions noted at Newbury.
For those who like to ponder on things, how long before any of the following change?
Remains of the old footbridge with OFF indicator.
Temporary cable bridge.
Temporary looking access to Oxford Rd on the down side.
Probably all dependant on what happens about a footbridge!