Current western end of the wires.
Situation today, bear in mind there is also work on the next three nights.
The down line is wired to just west of Alderton Tunnel, would be just passed MP97 3/4.
Before Chipping Sodbury Tunnel there is a short wire run, then a gap before the tunnel.
Western end is wired from the tunnel to around MP104. There is then a gap through the facing points and adjacent to part of the UGL. Wires then run to just before Westerleigh Jn, approximately MP107.
The up line wires end just east of Alderton Tunnel, around MP97 1/4.
Between the tunnels there is one wire run of around a mile through Badminton.
There is a short wire run from the west end of Chipping Sodbury Tunnel followed by a short gap.
The next run starts on the main before running through the points onto the UGL. From the points there is another short gap on the up main for part of the loop length (UGL is wired throughout).
Wires then continue as the down, end just before Westerleigh Jn.
Couple of Bristol Parkway views.
Plant line up, presume for the block coming up.