Blinds and sink top hinges have been a problem since day 1 of refurb. Not fit for purpose. Supplier now defunct so warranty invalid etc. Various mods have been tried, latest on 10532. Should have kept originals.... .
Vacuum pack is a trial in coach G as many people want a single berth but come summer when train iis fully booked , all doubles will be required again as per last summer. Its supposed to save time on train prep but its not going to when busy. Ongoing staff issues. With the ORR door/window/train length rulings, current plan is sticking to 4 and 5 SLEP vehicles as current but as posted, all fluid at the moment.