Haymarket to Dalmeny electrification

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

68000

Member
Joined
27 Jan 2008
Messages
754
Does anyone know what kind of work is going on when the line as well as part of fife closes for the next 5 weekends (not including this weekend)
I am aware of track renewal near Almond viaduct (not the more famous one) and then Dalmeny
 
Last edited:

EastFifer

Member
Joined
22 May 2015
Messages
17
Took this photo on a bridge between Dalmeny Station and Edinburgh airport.

You can see either side of the track, the steel foundations ready for the OHLE masts to be fitted on-top of. I presume that’s the work that’s been carried out these past few weekends - including today.
 

Attachments

  • IMG_6263.jpeg
    IMG_6263.jpeg
    2.5 MB · Views: 180

snowball

Established Member
Joined
4 Mar 2013
Messages
7,761
Location
Leeds
Took this photo on a bridge between Dalmeny Station and Edinburgh airport.

You can see either side of the track, the steel foundations ready for the OHLE masts to be fitted on-top of. I presume that’s the work that’s been carried out these past few weekends - including today.
That's surprising, with the emptying of the compound I assumed work had stopped completely.
 

Waverleystu

Member
Joined
12 Nov 2017
Messages
67
Took this photo on a bridge between Dalmeny Station and Edinburgh airport.

You can see either side of the track, the steel foundations ready for the OHLE masts to be fitted on-top of. I presume that’s the work that’s been carried out these past few weekends - including today.
Wasn’t that the work carried out before? Noticed that there was a lot of foundations in place back in October from the work earlier this year
 

mcmad

Member
Joined
11 Mar 2015
Messages
979
The works the last few weekend have been track renewals, there has been no progress on the electrification since works were paused and the compound cleared as noted above although I have heard it may be starting up again next year.
 

chuff chuff

Member
Joined
25 Sep 2018
Messages
465
Those piles have been in for quite some time now and as in a few posts above the compound has been empty for months.
 

A330Alex

Member
Joined
13 Feb 2019
Messages
223
More than a year for some of the foundations This is from from August 2022:
 

Attachments

  • IMG_9911.jpeg
    IMG_9911.jpeg
    858.3 KB · Views: 84

EastFifer

Member
Joined
22 May 2015
Messages
17
Does anybody know if they’ll close the line during the festive period for works, like they said they’d do last year?
 

chuff chuff

Member
Joined
25 Sep 2018
Messages
465
Dunno but I did see numbers/letters chalked on to the station steelwork at gateway possibly stanchion numbers for the overheads, don't know how long that has been there.
 

InOban

Established Member
Joined
12 Mar 2017
Messages
4,223
There's
Does anybody know if they’ll close the line during the festive period for works, like they said they’d do last year?
No, judging by the scotrail and lner timetables. Work in the vicinity of haymarket over new year
 
Joined
29 Nov 2018
Messages
626
Dunno but I did see numbers/letters chalked on to the station steelwork at gateway possibly stanchion numbers for the overheads, don't know how long that has been there.
ScotRail are advertising passenger services using this line on Boxing Day this year so lengthy closures supporting electrification seem unlikely.
However they may be able to make progress using closures on Christmas Day and New Year's Day.
 

takno

Established Member
Joined
9 Jul 2016
Messages
5,099
ScotRail are advertising passenger services using this line on Boxing Day this year so lengthy closures supporting electrification seem unlikely.
However they may be able to make progress using closures on Christmas Day and New Year's Day.
Presumably anybody who would be able to do any work just on Christmas Day is likely to instead be pulled into working on another project somewhere which can get a longer possession
 

chuff chuff

Member
Joined
25 Sep 2018
Messages
465
ScotRail are advertising passenger services using this line on Boxing Day this year so lengthy closures supporting electrification seem unlikely.
However they may be able to make progress using closures on Christmas Day and New Year's Day.
Ah yeah forgot there will be more trains running boxing day this year.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
6,173
Location
Surrey
Scottish Govt setting out there spending plans next week. The press release is a bit foreboding that priorities are changing and i suspect this along with many other schemes will now have elongated delivery which wont help on delivering efficiency

“The Autumn Statement was devastating for Scottish finances. The Institute for Fiscal Studies has acknowledged that it will lead to planned real terms cuts in public service spending. Scotland is facing a 9.8% cut to our capital budget for infrastructure between this year and 2027-28.

https://www.gov.scot/news/reaffirming-scotlands-social-contract
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,302

92002

Member
Joined
27 Mar 2014
Messages
1,137
Location
Clydebank
Does anybody know if they’ll close the line during the festive period for works, like they said they’d do last year?
Think they have slipped the Dalmeny electrification down the pecking order. They are not getting enough from the London Government to complete the schemes in their list on current timescales

Big thing this Festive Period is replacement of Greenhill Junction, with electrification continuing to East Kilbride.
 

EastFifer

Member
Joined
22 May 2015
Messages
17
Honestly, what a disaster this whole electrification project has turned out to be. I thought they already had the money to be able to carry out the work. After all, they’ve piled a whole load of still cylinders for the masts. And let’s be honest, it’s not exactly a difficult route with many obstacles to contend with.

It’s a shame how the west of Scotland seems to get electrification priority most of the time.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
23,405
Location
Bolton
Honestly, what a disaster this whole electrification project has turned out to be. I thought they already had the money to be able to carry out the work. After all, they’ve piled a whole load of still cylinders for the masts. And let’s be honest, it’s not exactly a difficult route with many obstacles to contend with.

It’s a shame how the west of Scotland seems to get electrification priority most of the time.
Given how long it will take to get a battery fleet into service to actually make the benefits worthwhile, it's unfortunately inevitable it would be delayed. Until then literally a handful of services per day only would benefit.
 

92002

Member
Joined
27 Mar 2014
Messages
1,137
Location
Clydebank
Honestly, what a disaster this whole electrification project has turned out to be. I thought they already had the money to be able to carry out the work. After all, they’ve piled a whole load of still cylinders for the masts. And let’s be honest, it’s not exactly a difficult route with many obstacles to contend with.

It’s a shame how the west of Scotland seems to get electrification priority most of the time.
The installation of mast piles was only a means of keeping their contractors doing something useful. So as not to allow staff being paid off and disbanded.

Aberdeen to the Central Belt Is a large Project that willl last many years it's not been funded qnd will be funded over many budget years.

The Dalmeny scheme is only one of many that will create the full scheme. One of which will be Fife Circle electrification. Then onwards to Dundee and Aberdeen. Also from Dundee to Perth and Dunblane. Depending on funding it could last for Ten or more years.
 

InOban

Established Member
Joined
12 Mar 2017
Messages
4,223
The Westminster budget changes including HS2 has reduced the Barnett Consequntials in capital funding to Holyrood. Not saying that ScoGov hasn't made some stupid decisions, but in comparison with Westminster....
 

EastFifer

Member
Joined
22 May 2015
Messages
17
Given how long it will take to get a battery fleet into service to actually make the benefits worthwhile, it's unfortunately inevitable it would be delayed. Until then literally a handful of services per day only would
Given how long it will take to get a battery fleet into service to actually make the benefits worthwhile, it's unfortunately inevitable it would be delayed. Until then literally a handful of services per day only would benefit.
I reckon it’ll be diesel for the next 30+ years!!
The Westminster budget changes including HS2 has reduced the Barnett Consequntials in capital funding to Holyrood. Not saying that ScoGov hasn't made some stupid decisions, but in comparison with Westminster....
The Westminster budget changes including HS2 has reduced the Barnett Consequntials in capital funding to Holyrood. Not saying that ScoGov hasn't made some stupid decisions, but in comparison with Westminster....
You seem obsessed with Westminster? I’m so glad we aren’t run by the SNP… they’re the main reason this simple project is all but over.
Anyway, it won’t be long until they are a thing of the past and us Scots go back to voting Labour!!
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
30,865
Location
Scotland
You seem obsessed with Westminster? I’m so glad we aren’t run by the SNP… they’re the main reason this simple project is all but over.
If the funding is reduced it's been reduced, regardless of the party in power at Holyrood.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,302
If the funding is reduced it's been reduced, regardless of the party in power at Holyrood.
Yes some people don’t realise that when overall funding goes down in England the Scottish Government’s funding also goes down thanks to the Barnett Formula.
 

68000

Member
Joined
27 Jan 2008
Messages
754
You seem obsessed with Westminster? I’m so glad we aren’t run by the SNP… they’re the main reason this simple project is all but over.
Anyway, it won’t be long until they are a thing of the past and us Scots go back to voting Labour!!

It does not matter who is in Holyrood if the UK govt cuts capital expenditure then it cuts it for the devolved areas as well
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
2,723
It does not matter who is in Holyrood if the UK govt cuts capital expenditure then it cuts it for the devolved areas as well
My understanding is that although the overall block grant from Westminster depends on the level of spending set in the UK budget, how the devolved governments spend is up to them. If Holyrood wants to maintain capital spending on the railways they can cut something else.
 

92002

Member
Joined
27 Mar 2014
Messages
1,137
Location
Clydebank
My understanding is that although the overall block grant from Westminster depends on the level of spending set in the UK budget, how the devolved governments spend is up to them. If Holyrood wants to maintain capital spending on the railways they can cut something else.
No doubt all will be revealed in the Hollyrood budget tomorrow. However they do not seem to be getting any Barnett consequentials from The cutting of HS2, which would naturally go on similar schemes for Scotland .

Perhaps they should cut funding of the Health Service, local Government or the Police, Fire and ambulance service to fund electrification.

Doubtful that would go down well.

What they could of course do is use their tax raising powered to raise taxes to fund it.

Life is full of choices.
 

takno

Established Member
Joined
9 Jul 2016
Messages
5,099
My understanding is that although the overall block grant from Westminster depends on the level of spending set in the UK budget, how the devolved governments spend is up to them. If Holyrood wants to maintain capital spending on the railways they can cut something else.
I suspect the point is more that the Westminster government is going about making arbitrary unplanned decisions at short notice like cancelling HS2, and as a result the devolved nations are left scrabbling around to cope with sudden changes to their budgets. The SNP hace made quite a mess on their own, but dealing with a hapless bunch of reactionaries making Westminster policy on the hoof isn't exactly helping.
 

68000

Member
Joined
27 Jan 2008
Messages
754
My understanding is that although the overall block grant from Westminster depends on the level of spending set in the UK budget, how the devolved governments spend is up to them. If Holyrood wants to maintain capital spending on the railways they can cut something else.
Yes they can altough it totally messes up planned expenditure in a host of areas, imagine the uproar if the Scottish govt cut spending in health to divert the cash to Fife electrification. None of this changes the fundamental fact that UK govt cutting capital investment will also cut the money available to the devolved areas and doing it in a haphazard fashion makes everyone look amateur
 