otomous

Member
Joined
5 Oct 2011
Messages
444
Was actually 1-6 high level, 7 closed, then 8-16 beforehand. Will be 1-9 through and 10-15 terminating after.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bicbasher

Established Member
Joined
14 May 2010
Messages
1,805
Location
London
I take it from the week beginning Jan 5, which is the last week of through Charing Cross services, it'll require using the Southern gateline and travelling via the subway retail outlets to get to platforms 1-6?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
32,208
I take it from the week beginning Jan 5, which is the last week of through Charing Cross services, it'll require using the Southern gateline and travelling via the subway retail outlets to get to platforms 1-6?

Nope, footbridge still open for that week. It goes on January 11th.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
7,662
I take it from the week beginning Jan 5, which is the last week of through Charing Cross services, it'll require using the Southern gateline and travelling via the subway retail outlets to get to platforms 1-6?

P5,6 will be permanently closed from the 11th.
Initially Up CHX services will use the Up Loop, Down CHX will use P4 but not stop.

So only access to P1-3...
 

neilm

Member
Joined
3 Jan 2012
Messages
499
The contingency plan is to run the current timetable so maybe the wrong poster has gone up.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
32,208
I can categorically state that the programme is running to time, and that these posters have not (or should not have) gone up. Indeed the service contingency plan is on a day by day basis, and not a full week.

Someone is making mischief.
 

sarahj

Established Member
Joined
12 Dec 2012
Messages
1,897
Location
Brighton
I heard of a small delay, but only of the few hours mark and nothing too worrying.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,438
I bet the journalists would like it to be delayed. Then they can have another go at Network Rail or am I being to cynical here?
 

Yabbadabba

Member
Joined
23 May 2014
Messages
385
Well that's a good sign, the test trains are going in. :)
 

Attachments

  • image.jpg
    image.jpg
    168 KB · Views: 176

Yabbadabba

Member
Joined
23 May 2014
Messages
385

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
32,208
So after an 'exciting' day today, all indications are that services will resume tomorrow as planned.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,438
So after an 'exciting' day today, all indications are that services will resume tomorrow as planned.
That will disappoint a few journalists who were probably hoping to be able to write a bash Network Rail news report.
 

Jimini

Established Member
Joined
8 Oct 2006
Messages
1,759
Location
Reading
Just in case you were interested, attached is what the station currently looks like from above.
 

Attachments

  • 042.jpg
    042.jpg
    100.5 KB · Views: 208

physics34

Established Member
Joined
1 Dec 2013
Messages
3,922
Just in case you were interested, attached is what the station currently looks like from above.

Thanks for this.

interesting to see the platform 9 wall is gone. It was meant to be listed i think so i dont know what has happened to that.

So the space is there for platforms 7, 8 and 9 which will be high level and 8 and 9 being for Charing cross services.

I'll be driving in and out of LBG tomorrow.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
7,662
All gone wrong now

Looks like a problem with the points on the scissors outside P15.

Good news is they have moved the hoarding back at the signal box end of P15 (though not at the more useful gate line end.)

Access to the underground from the concourse was taped off in the down direction due to an escalator fault.
 
Status
Not open for further replies.