Thank you to my predecessors for initially creating and then taking on the updating of this thread.

This first post lists only those stations considered to have a good chance of being delivered in a reasonable timescale. I have taken the list ‘as is’ at December 2020 and will update it when there is new information from a reliable source, which essentially means a public statement by Network Rail or a TOC. Statements by a funding body, a development partner, a Local Authority or Government will also be considered.

Post 254 provides a list of all the stations discussed in this thread up to the end of December 2020 (65 in total). In preparing to take over the thread I have identified over 150 ‘proposed stations’ plus a number of ‘proposed lines’ where individual stations are not listed. Some of these proposals are very speculative (wouldn’t it be a good idea if …..), others were serious proposals which appear to have fallen by the wayside.

For the latest updates please refer to the latest thread posts, for the up-to-date comprehensive summary refer to the following table.

There is a separate thread for the more speculative proposals: New Stations and Schemes - a comprehensive list of speculative proposals

Opened in 2025StatusLocationBaker Atlas
page / grid ref
Notes
Newsham [NWH]opened 17 March 2025between Seaton Delaval and AshingtonDiscussion here
2025 and beyond (dated)Anticipated opening dateStatusLocationBaker Atlas
page / grid ref
Notes
Hairmyres [HMY]18 May 2025under constructionrelocation 600m west of present site86 D2Discussion here - it's a long thread!
Bedlington [BEJ]2025under constructionproposed Northumberland Line54 A1Discussion here
Blyth Bebside [BLI]2025under constructionproposed Northumberland Line54 B1Discussion here
Butetown [was Loudoun Square]2025under constructionbetween Queen Street and Cardiff Bay74 B2General South Wales Metro discussion here. A completion date of 2025 is now being suggested
Northumberland Park [NOP]2025under constructionproposed Northumberland Line54 B1Discussion here
Winslow [WNO]2025under constructionbetween Bicester and Bletchley25 D1Discussion here
Kings Heath [KIH]autumn 2025under constructionbetween Birmingham New Street and Kings Norton (Camp Hill Route)24 B2Discussion here
Moseley Village [MOV]autumn 2025under constructionbetween Birmingham New Street and Kings Norton (Camp Hill Route)77 D1Discussion here
Pineapple Road [PIR]autumn 2025under constructionbetween Birmingham New Street and Kings Norton (Camp Hill Route)24 B2Discussion here
Beaulieu Park [BPA]2025/26under constructionbetween Chelmsford and Hatfield Peverel20 A1Discussion here
White Rose [WRO]2025 (possibly)construction pausedbetween Cottingley and Morley42 B1Discussion here. New Stations Fund - 'round 4', was 'delayed', previously 'later in 2024', prior to that 'early 2024'.
Cambridge South [CMS]Early 2026under constructionbetween Cambridge and Shelford27 C1Discussion here
Darlaston [DAS]February 2026under constructionbetween Walsall and Wolverhampton76 A2
Willenhall [WIA]February 2026under constructionbetween Walsall and Wolverhampton24 A2
North Filton2026under constructionbetween Filton Abbey Wood and St Andrews Road75 B2Referred to as Brabazon in press release
Okehampton Interchange2026under constructionbetween Sampford Courteney and Okehampton4 D1Being discussed here and here.
Wixams2026construction pausedbetween Bedford and Flitwick26 D2Old discussion here, current discussion here.
Pill [PIA]2027Development Consent Order approvedbranch from Parson Street15 C2Discussion here
Portishead [POH]2027Development Consent Order approvedbranch from Parson Street15 C2Discussion here
Birmingham Curzon Street2029 - 2033under constructionHS224 A2
Birmingham Interchange2029 - 2033route works commencedHS225 B1Discussion here
Old Oak Common2029 - 2033under constructionHS296 B1
Other proposals being progressedStatusLocationBaker Atlas
page / grid ref
Notes
Balgray [BGY] (was Barrhead South)undatedprior approval / courtesy planning application grantedbetween Whitecraigs and Neilston86 C1Discussion here. A completion date of Spring 2026 has been suggested.
Cardiff Parkwayundatedplanning permission grantedbetween Cardiff Central and Newport15 C1Discussion here. All previous completion dates have passed with no spades in the ground.
Charfieldundatedplanning permission grantedbetween Yate and Cam & Dursley16 B1A completion date of spring 2027 has been suggested.
Cottam Parkwayundatedplanning permission grantedbetween Preston and Salwick40 B2Discussion here. A completion date of '2030 at the latest' has been suggested.
Crwys Roadundatedprior approval grantedbetween Queen Street and Heath High Level74 B2General South Wales Metro discussion here. Completion dates of 2023, 2024 or 2025 have been mentioned.
East Leeds Parkway / Thorpe Parkundatedproposedbetween Cross Gates and Garforth42 A2New Stations Fund - 'round 4'
Edginswellundatedplanning permission grantedbetween Newton Abbot and Torre3 B2New Stations Fund - round 3
Elland [ELN]undatedplanning permission grantedbetween Brighouse and Halifax / Sowerby Bridge42 B1Discussion here. A completion date of 2026 has been suggested.
Gabalfaundatedproposedbetween Cathays and Llandaf74 B2A completion date of 2028 has been suggested.
Golborneundatedplanning application submittedbetween Wigan North Western and Warrington / Newton-le-Willows / Patricroft41 C1Discussion here. A completion date of 2027 has been suggested.
Haxby P & Rundatedplanning application submittedbetween York and Malton48 D2Discussion here. New Stations Fund - round 3. A completion date of 2026 has been suggested.
Henburyundatedplanning application submittedbetween Filton Abbey Wood and St Andrews Road75 B1A completion date of 2025/26 has been suggested.
Leeds Bradford Airport Parkwayundatedproposedbetween Horsforth and Bramhall Tunnel42 A1Most recent discussion here. A completion date of 2025 has been suggested.
Liverpool Baltic [LVB]undatedplanning application submittedbetween Liverpool Central and Brunswick80 C2Most recent discussion here. A completion date of 2027 has been suggested.
Surrey Canal [SCE] [was Surrey Canal Road or New Bermondsey]undatedplanning permission grantedbetween Queens Road Peckham and Surrey Quays97 C2Discussion here. A completion date of early 2025 has been suggested.
Waverley (South Yorkshire)undatedproposedbetween Darnall and Woodhouse79 C2Restoring Your Railway: Ideas Fund Round Two
Wellington [WLQ]undatedproposedbetween Taunton and Tiverton Parkway5 B1A completion date of 2025 has been suggested.

Note: Updates will be mentioned in a new post at the end of the thread, and reflected in the above table.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
34,040
Location
A typical commuter-belt part of north-west England
Below is a summary of the information, now duly updated, of what the original thread originator had in mind in 2018. It is NOT intended to be used in conjunction with with the first posting on the thread information.

ALREADY OPENED

2019
Opened 3 June: Meridian Water [MRW]
Opened 15 December: Warrington West [WAW] , Robroyston [RRN]

2020
Opened 23 February: Worcestershire Parkway [WOP]
Opened 29 June: Horden [HRE]
Opened 15 October :
Kintore [KTR]

*********************************************************************************************************************************

2021

Expected by end of the year (in no particular order) : Bow Street; Reading Green Park; Portway (choices of suffix);Barking Riverside;


*********************************************************************************************************************************

2022 (and beyond) Elizabeth Line stations and HS2 stations:-
Elizabeth Line stations at : Bond Street, Tottenham Court Road, Canary Wharf, Custom House, Woolwich (the last three on the Abbey Wood branch line). These stations had been held up awaiting final funding confirmation)

HS2 stations at: Old Oak Common, Birmingham Interchange and Birmingham Curzon Street; Manchester Airport/Interchange

There were numerous suggestions for other stations made in earlier postings besides these which time will make clearer in the months to come.
 
Last edited:

telstarbox

Established Member
Joined
23 Jul 2010
Messages
6,120
Location
Wennington Crossovers
2019 hopefully - Bond Street Crossrail, Tottenham Court Road Crossrail, Canary Wharf Crossrail, Custom House Crossrail and Woolwich.
 

Network Turbo

New Member
Joined
6 Sep 2018
Messages
2
Thanks for making this thread, PR1Berske. Good to have a list that can be referred to.

I also found this website through google just now. It's very useful too- https://trundleage.co.uk/
Contains a list of recently opened stations as well as planned stations.
 

bussnapperwm

Established Member
Joined
18 May 2014
Messages
1,528
A few more that are to open during the WM franchise to be added to this list post 2020 (as part of franchise promises)
  • Darlaston - confirmed by Transport for West Midlands
  • Brierley Hill (Moor Street - near to Kingswinford Junction/Moor Street Goods Yard) - confirmed by Councillor Patrick Harley, leader of Dudley Council on his monthly Facebook Q&A
  • Brierley Hill (Canal Street Midland Metro Interchange) - same source as above
  • Moseley, Kings Heath and Hazelwell are planned for the Camp Hill line plus the island platform at King's Norton
 

Condor7

Member
Joined
13 Jul 2012
Messages
1,054
Location
Penrith
I thought this thread might be about a wall calendar featuring photos of different stations each month. What a shame, I would have gone for one of those. :)
 

lincolnshire

Member
Joined
12 Jun 2011
Messages
884
Rotherham Parkgate ? Is it a station or a tram terminus point / stop.

As by what I have seen you couldn,t stop a train there as the platforms are too low, its just for trams.
Its like the platforms at Rotherham Central at the far ends of the existing platforms they are a lot lower and are just for trams to stop at.
 

Andyjs247

Member
Joined
1 Jan 2011
Messages
729
Location
North Oxfordshire
Post 2020 you can add Winslow (also the High Level platforms at Bletchley). These are due to open hopefully in 2023 as part of EWR2
 

gtis

Member
Joined
15 Apr 2009
Messages
260
Location
darfield sth yorkshire
Rotherham Parkgate ? Is it a station or a tram terminus point / stop.

As by what I have seen you couldn,t stop a train there as the platforms are too low, its just for trams.
Its like the platforms at Rotherham Central at the far ends of the existing platforms they are a lot lower and are just for trams to stop at.
Yes it’s just a tram stop
Neil
 

Pshambro

Member
Joined
4 Oct 2015
Messages
50
I've had the idea to start this thread to have in one place a breakdown of when new stations are due to be built onto the network. I'm using currently information from various threads on here, rather than going too far into Google just yet.

Any information and what not would go towards something useful I think :)


2018
Likely:Rotherham Parkgate

2019
Likely: Warrington West; Robroyston; Worcestershire Parkway; Kintore; Meridian Water (ex. Angel Road); Bond Street Crossrail, Tottenham Court Road Crossrail, Canary Wharf Crossrail, Custom House Crossrail and Woolwich
Maybe: Dalcross; Winchburgh; Reading Green Park

Beyond 2020
Portway Parkway; East Linton; Renton


Lets not forget the shiny new ones on HS2 that you (personally) will never visit :)
 

InOban

Established Member
Joined
12 Mar 2017
Messages
4,388
I believe the funding for Kintore is committed, but Robroyston is to be funded by a £15k levy on each of the planned new houses, and so must depend on how rapidly they are built. Maybe someone who uses the route can tell us if work has started.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
9,802
Location
Hampshire
Where do we stand with regards to the 2 Devon openings of Marsh Barton and Kingskerswell? Or have they sadly now stalled?
 

Supercoss

Member
Joined
5 Jun 2016
Messages
338
2021. Brent Cross West
On Thameslink North route between Cricklewood & Hendon .
 

PR1Berske

Established Member
Joined
27 Jul 2010
Messages
3,025
Thanks for the info and updates. I'm away from my laptop for a day or so, once we're reunited, I'll post a new timetable :)
 

Stopper

Member
Joined
11 Nov 2017
Messages
668
I suspect nothing will happen on the Winchburgh front until the post-electrification Newbridge timetabling disaster has been sorted/confirmed.

Winchburgh will be a well-used and much needed station provided it gets a decent service, which the currently proposed one is not.

Kintore is also a great addition and a station that will likely be well served.
 

PR1Berske

Established Member
Joined
27 Jul 2010
Messages
3,025
The original post has been updated :) I've removed Rotherham as that appears not to be a mainline railway station.
 

LewFinnis

Member
Joined
22 Aug 2013
Messages
107
Another one 'in the pipeline' if the money can be found is Thanet Parkway off the A299 near Minster. Might become Thanet International if Manston Airport ever re-opens!
 

Clip

Established Member
Joined
28 Jun 2010
Messages
10,822
Another one 'in the pipeline' if the money can be found is Thanet Parkway off the A299 near Minster. Might become Thanet International if Manston Airport ever re-opens!

I doubt that will ever be built and same goes for Manston to reopen as an airport
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
32,851
I’m also surprised the OP didn’t include the HS2 stations. Doesn’t he think they’ll be built?
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
17,607
Willenhall will be post 2020 and Im still dubious over the Brierley Hill ones regardless of what a councilor may say.
 

davetheguard

Established Member
Joined
10 Apr 2013
Messages
1,849
Reading Green Park is now Summer 2019

I got a glimpse of construction looking well advanced from a Voyager passing the site of Worcestershire Parkway last week; anything to be seen from the train at Reading Green Park yet?
 

Top