Baxenden Bank
Established Member
- Joined
- 23 Oct 2013
- Messages
- 4,295
Thank you to my predecessors for initially creating and then taking on the updating of this thread.
This first post lists only those stations considered to have a good chance of being delivered in a reasonable timescale. I have taken the list ‘as is’ at December 2020 and will update it when there is new information from a reliable source, which essentially means a public statement by Network Rail or a TOC. Statements by a funding body, a development partner, a Local Authority or Government will also be considered.
Post 254 provides a list of all the stations discussed in this thread up to the end of December 2020 (65 in total). In preparing to take over the thread I have identified over 150 ‘proposed stations’ plus a number of ‘proposed lines’ where individual stations are not listed. Some of these proposals are very speculative (wouldn’t it be a good idea if …..), others were serious proposals which appear to have fallen by the wayside.
For the latest updates please refer to the latest thread posts, for the up-to-date comprehensive summary refer to the following table.
There is a separate thread for the more speculative proposals: New Stations and Schemes - a comprehensive list of speculative proposals
Note: Updates will be mentioned in a new post at the end of the thread, and reflected in the above table.
This first post lists only those stations considered to have a good chance of being delivered in a reasonable timescale. I have taken the list ‘as is’ at December 2020 and will update it when there is new information from a reliable source, which essentially means a public statement by Network Rail or a TOC. Statements by a funding body, a development partner, a Local Authority or Government will also be considered.
Post 254 provides a list of all the stations discussed in this thread up to the end of December 2020 (65 in total). In preparing to take over the thread I have identified over 150 ‘proposed stations’ plus a number of ‘proposed lines’ where individual stations are not listed. Some of these proposals are very speculative (wouldn’t it be a good idea if …..), others were serious proposals which appear to have fallen by the wayside.
For the latest updates please refer to the latest thread posts, for the up-to-date comprehensive summary refer to the following table.
There is a separate thread for the more speculative proposals: New Stations and Schemes - a comprehensive list of speculative proposals
Opened in 2025 | Status | Location | Baker Atlas page / grid ref | Notes | |
Newsham [NWH] | opened 17 March 2025 | between Seaton Delaval and Ashington | Discussion here | ||
2025 and beyond (dated) | Anticipated opening date | Status | Location | Baker Atlas page / grid ref | Notes |
Hairmyres [HMY] | 18 May 2025 | under construction | relocation 600m west of present site | 86 D2 | Discussion here - it's a long thread! |
Bedlington [BEJ] | 2025 | under construction | proposed Northumberland Line | 54 A1 | Discussion here |
Blyth Bebside [BLI] | 2025 | under construction | proposed Northumberland Line | 54 B1 | Discussion here |
Butetown [was Loudoun Square] | 2025 | under construction | between Queen Street and Cardiff Bay | 74 B2 | General South Wales Metro discussion here. A completion date of 2025 is now being suggested |
Northumberland Park [NOP] | 2025 | under construction | proposed Northumberland Line | 54 B1 | Discussion here |
Winslow [WNO] | 2025 | under construction | between Bicester and Bletchley | 25 D1 | Discussion here |
Kings Heath [KIH] | autumn 2025 | under construction | between Birmingham New Street and Kings Norton (Camp Hill Route) | 24 B2 | Discussion here |
Moseley Village [MOV] | autumn 2025 | under construction | between Birmingham New Street and Kings Norton (Camp Hill Route) | 77 D1 | Discussion here |
Pineapple Road [PIR] | autumn 2025 | under construction | between Birmingham New Street and Kings Norton (Camp Hill Route) | 24 B2 | Discussion here |
Beaulieu Park [BPA] | 2025/26 | under construction | between Chelmsford and Hatfield Peverel | 20 A1 | Discussion here |
White Rose [WRO] | 2025 (possibly) | construction paused | between Cottingley and Morley | 42 B1 | Discussion here. New Stations Fund - 'round 4', was 'delayed', previously 'later in 2024', prior to that 'early 2024'. |
Cambridge South [CMS] | Early 2026 | under construction | between Cambridge and Shelford | 27 C1 | Discussion here |
Darlaston [DAS] | February 2026 | under construction | between Walsall and Wolverhampton | 76 A2 | |
Willenhall [WIA] | February 2026 | under construction | between Walsall and Wolverhampton | 24 A2 | |
North Filton | 2026 | under construction | between Filton Abbey Wood and St Andrews Road | 75 B2 | Referred to as Brabazon in press release |
Okehampton Interchange | 2026 | under construction | between Sampford Courteney and Okehampton | 4 D1 | Being discussed here and here. |
Wixams | 2026 | construction paused | between Bedford and Flitwick | 26 D2 | Old discussion here, current discussion here. |
Pill [PIA] | 2027 | Development Consent Order approved | branch from Parson Street | 15 C2 | Discussion here |
Portishead [POH] | 2027 | Development Consent Order approved | branch from Parson Street | 15 C2 | Discussion here |
Birmingham Curzon Street | 2029 - 2033 | under construction | HS2 | 24 A2 | |
Birmingham Interchange | 2029 - 2033 | route works commenced | HS2 | 25 B1 | Discussion here |
Old Oak Common | 2029 - 2033 | under construction | HS2 | 96 B1 | |
Other proposals being progressed | Status | Location | Baker Atlas page / grid ref | Notes | |
Balgray [BGY] (was Barrhead South) | undated | prior approval / courtesy planning application granted | between Whitecraigs and Neilston | 86 C1 | Discussion here. A completion date of Spring 2026 has been suggested. |
Cardiff Parkway | undated | planning permission granted | between Cardiff Central and Newport | 15 C1 | Discussion here. All previous completion dates have passed with no spades in the ground. |
Charfield | undated | planning permission granted | between Yate and Cam & Dursley | 16 B1 | A completion date of spring 2027 has been suggested. |
Cottam Parkway | undated | planning permission granted | between Preston and Salwick | 40 B2 | Discussion here. A completion date of '2030 at the latest' has been suggested. |
Crwys Road | undated | prior approval granted | between Queen Street and Heath High Level | 74 B2 | General South Wales Metro discussion here. Completion dates of 2023, 2024 or 2025 have been mentioned. |
East Leeds Parkway / Thorpe Park | undated | proposed | between Cross Gates and Garforth | 42 A2 | New Stations Fund - 'round 4' |
Edginswell | undated | planning permission granted | between Newton Abbot and Torre | 3 B2 | New Stations Fund - round 3 |
Elland [ELN] | undated | planning permission granted | between Brighouse and Halifax / Sowerby Bridge | 42 B1 | Discussion here. A completion date of 2026 has been suggested. |
Gabalfa | undated | proposed | between Cathays and Llandaf | 74 B2 | A completion date of 2028 has been suggested. |
Golborne | undated | planning application submitted | between Wigan North Western and Warrington / Newton-le-Willows / Patricroft | 41 C1 | Discussion here. A completion date of 2027 has been suggested. |
Haxby P & R | undated | planning application submitted | between York and Malton | 48 D2 | Discussion here. New Stations Fund - round 3. A completion date of 2026 has been suggested. |
Henbury | undated | planning application submitted | between Filton Abbey Wood and St Andrews Road | 75 B1 | A completion date of 2025/26 has been suggested. |
Leeds Bradford Airport Parkway | undated | proposed | between Horsforth and Bramhall Tunnel | 42 A1 | Most recent discussion here. A completion date of 2025 has been suggested. |
Liverpool Baltic [LVB] | undated | planning application submitted | between Liverpool Central and Brunswick | 80 C2 | Most recent discussion here. A completion date of 2027 has been suggested. |
Surrey Canal [SCE] [was Surrey Canal Road or New Bermondsey] | undated | planning permission granted | between Queens Road Peckham and Surrey Quays | 97 C2 | Discussion here. A completion date of early 2025 has been suggested. |
Waverley (South Yorkshire) | undated | proposed | between Darnall and Woodhouse | 79 C2 | Restoring Your Railway: Ideas Fund Round Two |
Wellington [WLQ] | undated | proposed | between Taunton and Tiverton Parkway | 5 B1 | A completion date of 2025 has been suggested. |
Note: Updates will be mentioned in a new post at the end of the thread, and reflected in the above table.