RobShipway
Established Member
- Joined
- 20 Sep 2009
- Messages
- 3,337
I do wonder if TPE will actually place an order for more Hiatchi AT300 units or be passed some AT300 units, such that both the class 397 units and the standard carriage MK5A carriages would be combined together to make 12 9 carriage trains for LNER?
The 14 driving carriages would either be scrapped for spares or sent abroad if they could be used with existing CAF coaches being used.
The 14 driving carriages would either be scrapped for spares or sent abroad if they could be used with existing CAF coaches being used.