Springs Branch
Established Member
The last new mechanical signal box installed by BR's London Midland Region controlled the signals at Uttoxeter station.
The last mechanical frame of all was installed by the Western Region at Porth.
(Both locations were commissioned within a month or two of each other in 1981)
The last mechanical frame of all was installed by the Western Region at Porth.
(Both locations were commissioned within a month or two of each other in 1981)