SWR Repaints and Refurbishments

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,442
As this is the right forum, does anyone know whats going on with the 159/1s none have been refurbished yet even though they finished on the 159/0s ages ago. Also they seem to have applied the livery to the 159s yet not changed the interiors.
Welcome.

AIUI from earlier discussions the 158/159 interior and exterior work is being done by separate contracts, and although the interior stuff is obviously delayed, according to the 2017 franchise agreement it was originally only due to finish by Dec 2020 anyway.

Post #3095 in this thread records the latest tender being issued in June this year.

It’s all gone a bit quiet, I’m now wondering if there‘s any actual need to alter the seating capacities? The intended changes, eg altering first class to 2+2 layout, were fairly minimal…
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

444045

Member
Joined
25 Apr 2020
Messages
836
Location
Dorset
Pleased to say that U.450030 is now back in traffic after its repaint and currently can be found on :

2B36 10 05 Bournemouth to Winchester
2B27 11 49 Winchester to Bournemouth
2B52 14 05 Bournemouth to Winchester
2B43 15 49 Winchester to Southampton
2B06 17 20 Southampton to Eastleigh
5B07 17+41 Eastleigh to Northam Depot

Believe that U.450089 has now taken its place for repaint.
 

TT-ONR-NRN

Established Member
Joined
30 Dec 2016
Messages
10,481
Location
Farnham
Pleased to say that U.450030 is now back in traffic after its repaint and currently can be found on :

2B36 10 05 Bournemouth to Winchester
2B27 11 49 Winchester to Bournemouth
2B52 14 05 Bournemouth to Winchester
2B43 15 49 Winchester to Southampton
2B06 17 20 Southampton to Eastleigh
5B07 17+41 Eastleigh to Northam Depot

Believe that U.450089 has now taken its place for repaint.
I’m noticing a pattern here :lol: they keep putting them on Winchester Bournemouth shuttles as soon as they’ve been repainted!
 
Joined
25 Oct 2020
Messages
368
Location
Epsom Downs
As this is the right forum, does anyone know whats going on with the 159/1s none have been refurbished yet even though they finished on the 159/0s ages ago. Also they seem to have applied the livery to the 159s yet not changed the interiors.
The C6 order was :
159/1
158
159/0

so the 159/1s were done but all were completed in SWT time. 8880-8885/8889 were also completed pre franchise change.

8886 was in works at franchise change.

8887/8888/8890 and the first few 159/0s have the SWT interior and an earlier iteration of SWR livery.

when the next scope of works happens I would expect the same order would apply (8889 obviously now excluded)
 

Dan15812

Member
Joined
18 Oct 2018
Messages
422
Location
SW
SWR Desiro Repaints:

444s

002, 003, 005, 006, 007, 011, 012, 014, 015, 016, 017, 018, 019, 020, 021, 023, 024, 025, 027, 029, 030, 031, 032, 037, 038, 042 and 043 (27 units)(60% complete)

450s

005, 006, 009, 013, 014*, 015, 016, 017, 018, 020, 021, 022*, 023, 024, 025, 026, 027, 029, 030, 033, 034, 036, 038, 039, 041, 042, 043, 048, 056, 067, 081, 089, 101, 107, 113, 119 and 127 (35 units)(28% complete)

Feel free to let me know of any more repainted Desiros.


Note: (* = Currently being done)

444040 and 450111 have had vinyl wrap (not been painted)
 
Last edited:

444045

Member
Joined
25 Apr 2020
Messages
836
Location
Dorset
Pleased to say that U.450034 has been released off its repaint and is currently on :

2B44 1150 Poole : Winch (RP) with U.450104
2B35 1349 Winch : Poole (FP)
2B64 1650 Poole : Winch (RP)
2B55 1849 Winch : Poole (FP)

U.450042 has taken its place in Bournemouth Depot paint shed.

Pleased to say that U.450089 has been released off its repaint and is currently on :

2B44 11 50 Poole - Winch
2B35 13 49 Winch - Poole
2B64 16 50 Poole - Winch
2B55 18 49 Winch - Poole

U.450022 has taken its place in Bournemouth Depot paint shed.
 
Last edited:

444045

Member
Joined
25 Apr 2020
Messages
836
Location
Dorset
As far as I know, it was deemed that there was not sufficient 450's being repainted than 444's. Be in mind there is only 45x444's compared
to 127x450's - so when they stopped repainting the 444's 60% had been done compared to 7% of 450's - now upto 28% as of last weekend.

The plan is keep repainting the 450's at 2 at a time until the end of October then go back to 1x444 & 1x450 repaints at a time.
This of course could be subject to alteration.

Hope that clears up your question.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,442
Don't really see the point of continuing repaints on any TOC when a rebrand is around the corner
If the ROSCO needs them painting for planned maintenance purposes, age related, then they‘ll get painted. Nobody knows if there’ll be a national livery plan yet.
 

Goldfish62

Established Member
Joined
14 Feb 2010
Messages
10,065
Don't really see the point of continuing repaints on any TOC when a rebrand is around the corner
GBR is at least three years away, then it'll doubtless take a while to settle on any new liveries because there will be more important things to be getting on with.
 

Dan15812

Member
Joined
18 Oct 2018
Messages
422
Location
SW
SWR Desiro Repaints:

444s

002, 003, 005, 006, 007, 011, 012, 014, 015, 016, 017, 018, 019, 020, 021, 023, 024, 025, 027, 029, 030, 031, 032, 037, 038, 042 and 043 (27 units)(60% complete)

450s

005, 006, 009, 013, 014, 015, 016, 017, 018, 020, 021, 022, 023, 024, 025, 026, 027, 029, 030, 033, 034, 036, 038, 039, 041, 042, 043, 048, 052, 053, 055*, 056, 063*, 067, 081, 089, 101, 107, 113, 119, 122 and 127 (40 units)(31% complete)

Feel free to let me know of any more repainted Desiros.


Note: (* = Currently being done)

444040 and 450111 have had vinyl wrap (not been painted)
 
Last edited:

444045

Member
Joined
25 Apr 2020
Messages
836
Location
Dorset
Pleased to say that U.450014 is back in service after its repaint and can be currently found working :

2B19 0949 Win - Bomo
2B44 1205 Bomo - Win
2B35 1349 Win - Bomo
2B60 1605 Bomo - Win
2B93 1744 Win - Sou
5Y08 19+14 Sou - Wok via Hav
5Y03 21+37 Wok - Bomo Depot via Hav

U.450106 arrives at Bomo Depot tonight for its repaint.
 

Bn2020

Member
Joined
20 Sep 2019
Messages
14
Location
London - SWR Land
GBR is at least three years away, then it'll doubtless take a while to settle on any new liveries because there will be more important things to be getting on with.
You would hope, but given the nature of the current cosplay cabinet I wouldn't be so sure. Even in the BR days, I don't think there was a unified single livery, so does having trains in various shades of blue and grey in various parts of the country really matter?

Does anyone know how long repainting the entire fleet in England would take? It couldn't be an overnight process and will take many years, even decades.
 

Dan15812

Member
Joined
18 Oct 2018
Messages
422
Location
SW
SWR Desiro Repaints:

444s

002, 003, 005, 006, 007, 011, 012, 014, 015, 016, 017, 018, 019, 020, 021, 023, 024, 025, 027, 029, 030, 031, 032, 037, 038, 042 and 043 (27 units)(60% complete)

450s

005, 006, 009, 013, 014, 015, 016, 017, 018, 020, 021, 022, 023, 024, 025, 026, 027, 029, 030, 033, 034, 036, 038, 039, 041, 042, 043, 048, 052, 053, 055, 056, 057*, 063, 067, 081, 089, 096*, 101, 107, 113, 119, 122, 123 and 127 (43 units)(34% complete)

Feel free to let me know of any more repainted Desiros.


Note: (* = Currently being done)

444040 and 450111 have had vinyl wrap (not been painted)
 
Last edited:

Goldfish62

Established Member
Joined
14 Feb 2010
Messages
10,065
When I was passing through Waterloo the other day I was struck by the number of Desiros that appeared to have only recently been repainted (ie their fronts were clean). Has the repaint programme ramped up recently?
 

444045

Member
Joined
25 Apr 2020
Messages
836
Location
Dorset
No it hasn't been ramped up, still 2 x 450 in the paint shed at any one time (450057/096 presently) at Bournemouth Depot.

I think that now 43 units have been repainted, it looks like more have been done and I've noticed some depots or stabling points
have been forming services with newly painted units together.

Hope this answers your question @Goldfish62 .
 

Goldfish62

Established Member
Joined
14 Feb 2010
Messages
10,065
No it hasn't been ramped up, still 2 x 450 in the paint shed at any one time (450057/096 presently) at Bournemouth Depot.

I think that now 43 units have been repainted, it looks like more have been done and I've noticed some depots or stabling points
have been forming services with newly painted units together.

Hope this answers your question @Goldfish62 .
Many thanks!
 
Joined
25 Oct 2020
Messages
368
Location
Epsom Downs
Yes, because every day they dither around having not let the contract, customers are still having to travel on unrefurbished stock.
You do know it wasn't SWR's contract to let directly, it isn't as simplistic as SWR have dithered.
Angel own the trains
Siemens are contracted to maintain the trains
SWR in the case of the repaints are a sub-contractor to Siemens
If any problems are found eg corrosion etc or changes to specification that all has to be agreed and holds up work.
 

Bigfoot

Member
Joined
2 Dec 2013
Messages
1,122
Yes, because every day they dither around having not let the contract, customers are still having to travel on unrefurbished stock.

You do know it wasn't SWR's contract to let directly, it isn't as simplistic as SWR have dithered.
Angel own the trains
Siemens are contracted to maintain the trains
SWR in the case of the repaints are a sub-contractor to Siemens
If any problems are found eg corrosion etc or changes to specification that all has to be agreed and holds up work.
Also, passengers don't care about the outside. The internal refurbishment was finished a long time ago. That's what passengers worry about.
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
6,673
Location
Northern England
You do know it wasn't SWR's contract to let directly, it isn't as simplistic as SWR have dithered.
Angel own the trains
Siemens are contracted to maintain the trains
SWR in the case of the repaints are a sub-contractor to Siemens
If any problems are found eg corrosion etc or changes to specification that all has to be agreed and holds up work.
Yes, I do know that. "They", in that case, was supposed to refer to the responsible group of organisations as a whole, and not to one specific company.

Also, passengers don't care about the outside.
I think they very much do. If the train turns up with worn, grubby paintwork, that is a poor first impression. Granted, it's not a major factor, but if you disregard things because they aren't a major factor, you'll start gradually harming the larger picture.

Besides, the insides weren't finished on time either.
 

Nogoohwell

Member
Joined
14 Aug 2020
Messages
53
Location
London
Yes, I do know that. "They", in that case, was supposed to refer to the responsible group of organisations as a whole, and not to one specific company.


I think they very much do. If the train turns up with worn, grubby paintwork, that is a poor first impression. Granted, it's not a major factor, but if you disregard things because they aren't a major factor, you'll start gradually harming the larger picture.

Besides, the insides weren't finished on time either.
And your point is?
I dont recall a deadline or an arrangement between SWR and the passengers to refurbish the units. If SWT had retained the franchise, would the 450's been refurbed to this standard to start with?

Agree the 450's looked terrible but there are not many places where you can take 127, 80 meter long trains to be stripped down, repaired and repainted within the third rail network.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
15,307
I dont recall a deadline or an arrangement between SWR and the passengers to refurbish the units.
There was: they specifically stated a timescale in all the PR flannel at the start of the franchise. Completion was 12 months late on the stated timescale.
If SWT had retained the franchise, would the 450's been refurbed to this standard to start with?
No, they’d have been refurbished to a higher standard. This is First, so low standards are what we should expect.
 