Wigan-Bolton electrification. Construction updates only please

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
I expected to see this a lot further on by now, a lot of structures are noticeably done but there isnt much to show lineside.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jonesy3001

Established Member
Joined
13 Jul 2009
Messages
3,260
Location
Otley, West Yorkshire
Possible when the piling is 100% complete Man Vic to Stalybridge (+Guide Bridge etc) , they will move to Wigan - Bolton.
It's going to be a different company doing the piling works on the bolton to wigan line, ready power I believe the name is.
Was chatting to a fella who works for lundys on LinkedIn about the piling works and he said it's a different company doing the electrification works.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,498
Location
Between Peterborough & Bedlington
It's going to be a different company doing the piling works on the bolton to wigan line, ready power I believe the name is.
Was chatting to a fella who works for lundys on LinkedIn about the piling works and he said it's a different company doing the electrification works.
Indeed, I believe SPL are doing Wigan - Bolton; they must have ReadyPower as piling subcontractor.

Edit: SPL have started work, in the Wigan NW area.
 
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
7,747
Location
Leeds
Simultaneous with completion of Stalybridge even though it's different companies. That can't be a coincidence, it must be planned for some reason. Perhaps to enable workers laid off by one company to go and work for another?
 

The Snap

Established Member
Joined
10 Jun 2005
Messages
3,147
Simultaneous with completion of Stalybridge even though it's different companies. That can't be a coincidence, it must be planned for some reason. Perhaps to enable workers laid off by one company to go and work for another?

A lot of the guys are casual workers anyway when it comes to railway piling (ie: the machine drivers, machine controllers etc). They hop from one company to another from weekend to weekend, depending where the work is.
 

CAF397

Member
Joined
28 Aug 2020
Messages
493
Location
Lancashire
Buckingham Group Contracting has ceased trading. They are currently doing the Hindley station Bridge rebuild and are looking to appoint Administrators.

It is with immeasurable regret that the Buckingham Board has to announce that rapidly escalating contract losses and a sharp reduction in liquidity, together mean the Company is unable to continue trading at this current time.

As a result of the recent challenges, the board has filed a Notice of Intention to appoint Administrators to protect the business whilst we explore a sale of all or part of the business in a very short period (days/weeks).

This will surely impact the planned opening of Ladies Lane in September.

 
Last edited:

507020

Established Member
Joined
23 May 2021
Messages
1,866
Location
Southport
Buckingham Group Contracting has ceased trading. They are currently doing the Hindley station rebuild and are looking to appoint Administrators.

This will surely impact the planned opening of Ladies Lane in September.
All the more reason why Network Rail should do this kind of work in house. No wonder there’s been little to no progress on this project for a while now.
 

Foggycorner

Member
Joined
16 Nov 2016
Messages
180
Location
bolton
some new piles have been put in outside wigan north west station and what look like ground survey squares have been cleared on the way to hindley but are now begining to be overgrown again
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
6,139
Location
Surrey
Buckingham Group Contracting has ceased trading. They are currently doing the Hindley station Bridge rebuild and are looking to appoint Administrators.





This will surely impact the planned opening of Ladies Lane in September.

Railway contracts usually profitable so ought to be able to find a buyer for the railway arm. NR also dealt with Carillion failure pretty well but for sure will be some delay but potentially a matter of weeks as administrators usually have feelers out in these situations
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Staff on the Hindley bridge downed tools on Friday and no work was done over the weekend Network Rail is saying they will create contingency plans to keep the 1st September reopening date. (I imagine thats likely to be offering to advance payments to cover the last week of works)

Buckingham Group say they have lost money on Coventry major earthworks and the Anfield, Northampton Town and Birmingham City Stadium redevelopments. Not the first time they have run into issues, they booked at £14.2m loss on Fulhams Craven Cottage stadium work two years ago after a supplier went under.
They were also working on the Whitley Bay T&W Metro station canopy refurbishment
 
Last edited:

Gricer99

Member
Joined
21 Jun 2020
Messages
210
Location
Hindley
There's no way the bridge was close to re-opening to traffic on September 1st. This was taken in the evening of August 17th. All the plant has gone and you can clearly see there is a huge amount of work still to do!
 

Attachments

  • 20230817_193211.jpg
    20230817_193211.jpg
    3.8 MB · Views: 149

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Crowning the top of the old walls, levelling over the new storm drain and road surfacing, theres less work to do than you would think.
 

Gricer99

Member
Joined
21 Jun 2020
Messages
210
Location
Hindley
Crowning the top of the old walls, levelling over the new storm drain and road surfacing, theres less work to do than you would think.
There's that small hill of rubble on the north east side to safely remove and then they have to build new walls to mate up to the new bridge. There's also the pavements, curbing and traffic control signs to do.
 

Attachments

  • 20230823_071808.jpg
    20230823_071808.jpg
    4.5 MB · Views: 46
  • 20230823_071850.jpg
    20230823_071850.jpg
    2.4 MB · Views: 45
  • 20230823_071904.jpg
    20230823_071904.jpg
    2.4 MB · Views: 46

td97

Established Member
Joined
26 Jul 2017
Messages
1,301
Not sounding promising in the short term
A spokesperson said: "We are assessing the impact on the Bolton to Wigan electrification scheme after the contractor Buckingham Group announced it was appointing administrators last week. All work is paused while the future of the firm is decided. In the meantime Network Rail is drawing up contingency plans on how projects can progress based on the possible outcomes of the administration process."
 

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,544
Location
St Helens, Merseyside

Snow1964

Established Member
Joined
7 Oct 2019
Messages
6,259
Location
West Wiltshire
This is New Civil Engineers summary of effect on scheme of Buckingham Group collapse

Network Rail has confirmed that its £78M project to electrify the railway between Bolton and Wigan has been paused due to contractor Buckingham Group entering administration.
Buckingham Group announced on 17 August that it is no longer able to continue trading due to “rapidly escalating contract losses and a sharp reduction in liquidity”. It specifically blamed interim cash deficits incurred on three major stadium and arena contracts and a substantial earthworks contract in Coventry due to unexpected impacts such as extreme inflation.

This was likely to cause upheaval on contracts that it was part-way through delivering and Network Rail has confirmed that the Bolton to Wigan electrification scheme has been impacted.

It said in a statement: “We are assessing the impact on the Wigan to Bolton electrification scheme after the contractor Buckingham Group announced it was appointing administrators last week. All work is currently paused while the future of the firm is decided. In the meantime, Network Rail is drawing up contingency plans on how projects can progress based on the possible outcomes of the administration process.”

The electrification project is a £78M investment in overhead line equipment (OLE) and signalling improvements between Wigan North Western station and Lostock Junction in Bolton.

The works include installing 450 OLE stanchions, overhauling 17 bridges and modifying two level crossings.

Demolition and replacement of Ladies Lane Bridge in Hindley (pictured above) over the railway started at the end of June and the road was due to reopen on 1 September. Network Rail has confirmed that it is “working as quickly as [it] can to establish a way forward and [is] still aiming for the road closure to be removed on time”.

This is intended to futureproof the route and ensure that it is ready for Northern’s longer, electric trains when they are introduced on the route.

Northern has been contacted for comment.

 

Gricer99

Member
Joined
21 Jun 2020
Messages
210
Location
Hindley
This is New Civil Engineers summary of effect on scheme of Buckingham Group collapse



J. Murphy have been appointed and have been doing assessments. They seem to think that it will reopen sometime in September.
 

InOban

Established Member
Joined
12 Mar 2017
Messages
4,221
Murphy may merely be assessing the value of the work completed and remaining, so that the administrator can be correctly paid.
 

507020

Established Member
Joined
23 May 2021
Messages
1,866
Location
Southport
Murphy may merely be assessing the value of the work completed and remaining, so that the administrator can be correctly paid.
Would Network Rail appoint them merely for this, when there is an obvious need for all outstanding work to be completed? The road bridge can not be left closed or in unfinished condition for much longer.
 

InOban

Established Member
Joined
12 Mar 2017
Messages
4,221
Would Network Rail appoint them merely for this, when there is an obvious need for all outstanding work to be completed? The road bridge can not be left closed or in unfinished condition for much longer.
They will certainly be in prime position to complete the work, but the state of the works will need to be assessed first.
 

Gricer99

Member
Joined
21 Jun 2020
Messages
210
Location
Hindley
Just took some photos. They are really cracking on with the work now.
 

Attachments

  • 20230826_134217.jpg
    20230826_134217.jpg
    4.6 MB · Views: 104
  • 20230826_134250.jpg
    20230826_134250.jpg
    3.9 MB · Views: 102