Transpennine Express decide not to use MK3's on limited services

Status
Not open for further replies.

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,693
Location
Mold, Clwyd
Possibly a reluctance to repair a rival company's Mk3s?

Rival company?
It's all First Group, and it's all franchise business (commitments in fact, as we can see in the franchise agreement).
The delay in TP/Northern service changes to May 2018 due to late electrification may have knocked on to the Mk3 conversion plans.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

43096

On Moderation
Joined
23 Nov 2015
Messages
15,302
Is the fact that the two DRS DVTs had remedial cosmetic work started at Loram, then stopped and finally send to Long Marston, got anything linked with the Pretendolino impasse?

Mark 3 DVTs not part of the TPE plan AIUI.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,495
Location
Between Peterborough & Bedlington
Rival company?
It's all First Group, and it's all franchise business (commitments in fact, as we can see in the franchise agreement).
The delay in TP/Northern service changes to May 2018 due to late electrification may have knocked on to the Mk3 conversion plans.

Ahh I see. Just proves how little I know about the railway industry! :lol::oops:
 

CosherB

Established Member
Joined
23 Feb 2007
Messages
3,041
Location
Northwich
Is this plan to top-and-tail 68s with the Mk 3s for TPE still on?

Might need the help of someone like gimmea50anyday with this scheme. Last I heard, the whole rake was still languishing at Laira and no repairs/upgrades had started.

DRS bought DVTs 82101 and 82126, started work on their exteriors at Loram, then stopped it and moved them to Long Marston (I think) so the DVT rumour is dead.

TPE clearly aren't in a hurry for the 2 x Mk3 rakes!
 

pemma

Veteran Member
Joined
23 Jan 2009
Messages
31,474
Location
Knutsford
Might need the help of someone like gimmea50anyday with this scheme. Last I heard, the whole rake was still languishing at Laira and no repairs/upgrades had started.

DRS bought DVTs 82101 and 82126, started work on their exteriors at Loram, then stopped it and moved them to Long Marston (I think) so the DVT rumour is dead.

TPE clearly aren't in a hurry for the 2 x Mk3 rakes!

When are the first mk5 sets expected to be in service? With the proposed December 2017 recast being put back to May 2018 due to Northern not getting enough Sprinters from GWR, it means TPE don't require extra units for an additional 6 months. Although, they were suppose to have the mk3 set available ASAP so they could use it for special events like York races.
 

gimmea50anyday

Established Member
Joined
8 Jan 2013
Messages
3,456
Location
Back Cab
The mk3s are stilll proposed to be used for training and as "crowd busters" however no start date has been confirmed despite the mk3s and 3 68s now being on TPEs books. One 68 is due to ship out to Spain for compatibility tests.

That's all I know....
 

43096

On Moderation
Joined
23 Nov 2015
Messages
15,302
The mk3s are stilll proposed to be used for training and as "crowd busters" however no start date has been confirmed despite the mk3s and 3 68s now being on TPEs books. One 68 is due to ship out to Spain for compatibility tests.

That's all I know....

It's now four 68s.... 68022 is stopped at Crewe and has transferred to the XHTP pool.
 

alexl92

Established Member
Joined
12 Oct 2014
Messages
2,276
Referring back to a comment earlier in this thread, why would MK3 DVTs be out of gauge if the normal MK3 coaches are cleared? Are they longer?
 

CosherB

Established Member
Joined
23 Feb 2007
Messages
3,041
Location
Northwich
Referring back to a comment earlier in this thread, why would MK3 DVTs be out of gauge if the normal MK3 coaches are cleared? Are they longer?

A very simple internet search will tell you that a Mk3 DVT is about 19m long.
 

BMIFlyer

Member
Joined
13 Mar 2017
Messages
723
Update as of today on this project:

2x Mk3 sets to be used
Crew training starting within a month
Both sets will be placed on the Liverpool to Scarborough route, but starting and ending the diagrams each day at either Longsight or Manchester Airport (1 set will start or end at each location - in essence one will stable overnight on depot and the other at the airport).

This will free up 2 class 185s, to strengthen other services / speed up maintenance / overhauls, etc.

The primary aim of the mk3s being used is to train drivers on class 68 operation with a trailing load.

In May 2018 the Mk5A sets will begin operation and the Mk3s will depart.
 
Last edited:

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
5,243
Update as of today on this project:

2x Mk3 sets to be used
Crew training starting within a month
Both sets will be placed on the Liverpool to Scarborough route, but starting and ending the diagrams each day at either Longsight or Manchester Airport (1 set will start or end at each location - in essence one will stable overnight on depot and the other at the airport).

This will free up 2 class 185s, to strengthen other services / speed up maintenance / overhauls, etc.

The primary aim of the mk3s being used is to train drivers on class 68 operation with a trailing load.

In May 2018 the Mk5A sets will begin operation and the Mk3s will depart.

Good stuff, so is the rake scheduled to leave Plymouth anytime soon?
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
23,395
Location
Bolton
I would hope so as the sets will be placed into service on the December timetable change day.

I passed those coaches sat at Liara recently - they looked untouched. No visible changes inside or out from when I first saw them there.
 

CosherB

Established Member
Joined
23 Feb 2007
Messages
3,041
Location
Northwich
I would hope so as the sets will be placed into service on the December timetable change day.

Is it true that the ex-Pretendolino rake needs plenty of mechanical TLC to get it fit for the mainline again? Are the RFMs still going to be modified to give guards accommodation?

I'd assume that cosmetic changes will be minimal - just some TPE logo stickers ......
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
97,895
Location
"Marston Vale mafia"
They're already in a silver livery (albeit with VT red roof-lining) and the interiors are, while they have IC70 seating, not *that* unpleasant. So not much really needed.
 

Mollman

Established Member
Joined
21 Sep 2016
Messages
1,236
Update as of today on this project:
In May 2018 the Mk5A sets will begin operation and the Mk3s will depart.

Thanks for the update, does this mean a revision of the plan to keep the Mk3s for special event extras then?
 

pemma

Veteran Member
Joined
23 Jan 2009
Messages
31,474
Location
Knutsford
Thanks for the update, does this mean a revision of the plan to keep the Mk3s for special event extras then?

The original plan was to have them in regular service from December 17 until the new trains were in service but with the December 17 enhancements being postponed it seemed less likely that they would be used in regular service.
 

pemma

Veteran Member
Joined
23 Jan 2009
Messages
31,474
Location
Knutsford
Both sets will be placed on the Liverpool to Scarborough route, but starting and ending the diagrams each day at either Longsight or Manchester Airport (1 set will start or end at each location - in essence one will stable overnight on depot and the other at the airport).

So will Scarborough still be via Warrington in December or will it be re-routed via Chat Moss? While the extra carriages would be welcome on the Liverpool-Warrington-Manchester line, I think using loco-hauled may create problems with dwell times.
 
Last edited by a moderator:

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
9,677
Location
Nowhere near enough to a Pacer :(
Perfectly workable IMO, on ScotRail there are MK2s doing Fife Circle passenger work with a stop every 5 to 10 minutes on busy morning and evening commuter trains, not an automatically opening external door to be found unless you count the one at the very front which more often than not will be opperated by a helpfull 68 basher who has taken up residence in the vestibule!
 

gimmea50anyday

Established Member
Joined
8 Jan 2013
Messages
3,456
Location
Back Cab
worth noting that I saw pictures of a 68 in TPE colours recently.


Disclaimer:- these images are openly available on social media/internet forums are are not my images!
 

Attachments

  • received_736759319865621.jpg
    received_736759319865621.jpg
    199.6 KB · Views: 276
  • attachment.jpg
    attachment.jpg
    68.2 KB · Views: 272
Last edited:
Status
Not open for further replies.

Top