good point. Won't take long to get the 385s there and back by rail. Pistoia will be busy with the GWR 802s though, if the 385s do need to go there I hope there's space for them in the facility.Remember there's always the option to send them to Italy for structural work, especially the completed units which can be sent there by rail.