What about Finsbury parkHaving watched a team of about 12 people work on the concrete paving outside the shard entrance for nearly 6 months now I’m convinced this is something of a scam
I’ve seen bigger areas than this be paved in a week and have no idea what these people are doing all day long
Perhaps they are relaying the same stones multiple times as there doesn’t seem to be any other possible explanation as to how little could change on a week to week basis - the whole area has looked 95% done for at least 3 months now.
Having watched a team of about 12 people work on the concrete paving outside the shard entrance for nearly 6 months now I’m convinced this is something of a scam
I’ve seen bigger areas than this be paved in a week and have no idea what these people are doing all day long
Perhaps they are relaying the same stones multiple times as there doesn’t seem to be any other possible explanation as to how little could change on a week to week basis - the whole area has looked 95% done for at least 3 months now.
I had real trouble finding the underground station today it use to be at the end of the concourse and via a passage but now you have to go outside into the streets took me ages to find it I hate what they've done to the station the haven't improved it they've just made it harder to navigate!
Thameslink is the only route that will use all the information features provided such as individual carriage loading.Why do Platforms 4 and 5 have the special departure boards but not the other high level platforms?
Any warm waiting area yet?First of the new Tooley Street outlets open.
Starbucks.
Like the area needs another one.
Any warm waiting area yet?
All of the retail outlets in the Western Arcade that have yet to open now have had a "Your first stop for Christmas" sticker put over the original Opening December 2018 ones. They do seem to be gradually getting there, and I think there are now more open than not-open, but certainly sounds like they're no longer confident in all being open by the end of the year!
The station because I'm confident that at least the station will, eventually, be finished...and Greggs is still not open.
Wondering what will come first, the complete delivery of the Thameslink May timetable, or the complete delivery of London Bridge station?
Costa Pronto on the low level platforms concourse looks nearly ready to open. The guys outside though are continuing at their snails pace speedGreggs has opened. Time to close the thread?
Costa Pronto on the low level platforms concourse looks nearly ready to open. The guys outside though are continuing at their snails pace speed
Greggs has opened. Time to close the thread?
The station because I'm confident that at least the station will, eventually, be finished
Has it really? That's great news, end of rip off prices in stations hopefully. I heard the delay was because there is an access panel in the ceiling to allow Network Rail access to under the viaduct above, and presumably cabling etc and someone forgot to tell Greggs and more importantly their shopfitters it was there!
You might have to elaborate on that!The station will never be finished, because unfortunately they allowed bits of it that weren't finished to be considered finished.
Has it really? That's great news, end of rip off prices in stations hopefully. I heard the delay was because there is an access panel in the ceiling to allow Network Rail access to under the viaduct above, and presumably cabling etc and someone forgot to tell Greggs and more importantly their shopfitters it was there!
Do they do the vegan sausage roll though?Greggs has opened. Time to close the thread?
Do they do the vegan sausage roll though?