D365
Veteran Member
- Joined
- 29 Jun 2012
- Messages
- 12,148
Alec Hynes tweeted that the mean time between failures is now over 60k.miles
That’s very impressive if true.
Alec Hynes tweeted that the mean time between failures is now over 60k.miles
Anyone got diagrams for 385s for Cathcart Circle and Newton services?
Are they going to Neilston in the future?
That service is always a 6 car 320/318, the rest are all 6 car 385s.Just spotted a 6 car 320 on Lanark, I thought this had been replaced by a 385? Surely they can't be short of 385's already.
Prior to Dec I noted the following workings:
14.51 Cathcart Circle
15.45 Newton and return
17.06 Cathcart Circle
17.45 Newton and return
all worked by the same unit which then went onto the 19.03 Edinburgh via Shotts
19.15 & 19.52 Cathcart Circle, more recently this was a 320
19.45 Newton and return, not sure if replaced by 320 like above
On Sat 14th the Newton dep from 15.20 onwards at XX.20 were all 385 (same unit)
Not sure if the above applies to the new Dec timetable
From what I have seen on here and another forum from the new timetable the following:
06.24 & 07.41 Newton to Central (same unit)
07.45 Central to Newton & 08.19 return (same unit) are 385 workings
Hope this is of some help
That service is always a 6 car 320/318, the rest are all 6 car 385s.
I know that but someone else said and apparently ScotRail tweeted that all the Lanark services would be 385 operated from the Dec timetable change, I am just wondering where the extra 5 318/320 units have come from to replace the 314's, as they don't seem to have been replaced by 385's. As previously commented, have they reduced capacity on the Argyle line to cover the 314's?
Personally didn't hear anything about the Lanark services being all 385s. Im not to sure if they have reduced capacity.I know that but someone else said and apparently ScotRail tweeted that all the Lanark services would be 385 operated from the Dec timetable change, I am just wondering where the extra 5 318/320 units have come from to replace the 314's, as they don't seem to have been replaced by 385's. As previously commented, have they reduced capacity on the Argyle line to cover the 314's?
Personally didn't hear anything about the Lanark services being all 385s. Im not to sure if they have reduced capacity.
In the morning peak 2 x 320 diagrams have been replaced by class 385s - this has released 2 units obviously - both diagrams run off to Shields after the peak.
To the best of my knowledge the Newton services above are 385s along with:
0813 Cathcart Outer Circle,
0850 Cathcart Outer Circle (both same unit off the 0741 ex-Newton)
0915 Cathcart Inner Circle and
0950 Cathcart Outer Circle (both same unit off 0745 Central to Newton.
Also the 2320 Glasgow Central to Newton is also a 385. Most other Newton via Queens Park workings seem to be a 380, which has released another 320. The 380 later forms the 2330 Glasgow Central to Ayr.
Has anymore been said on the 385s perhaps running in Ayrshire or was that idea fizzled out?
Has anymore been said on the 385s perhaps running in Ayrshire or was that idea fizzled out?
Has there been any mention of Scotrail taking the additional units? And particularly if these would have short range battery packs to allow running over the Forth Bridge? Though I suppose the shenanigans with the contract will probably have delayed this if it is being considered.
Thankfully? That's a matter of opinion.The additional 10 units were planned only if the additional 3 years extension to the contract was agreed. Thankfully it's not happening!
Thankfully? That's a matter of opinion.
The 385's are proving to be decent though?Indeed it is. It's been a fairly mediocre to abismal 5 years with the current franchisee, who have ran out of excuses and people to blame for their failures. Their bid looked fantastic on paper and I, along with many of my colleagues had great expectations of them being a real breath of fresh air compared to First but sadly it hasn't materialised.
The 385's are proving to be decent though?
It always make sense to engage with drivers. Surely draughts and heating are issues that could be resolved. From what I understand Hitachi are usually keen to overcome issues like these?Very reliable as you'd expect from Hitachi, however there's still alot of issues with them from the driver's side of things. Not least the severely restricted view from the windscreen, lots of draughts in the cab, complaints of them being cold even with the heating on, terrible on anything but the driest rails - Drivers don't look forward to driving them in smirry rain as they slide very easily. All in all they're not a great unit to drive from what I hear from my colleagues and I'm not looking forward to our depot getting them on our cards in 2020. Hopefully before any future rolling stock order is made for new stock they'll engage with drivers from the beginning before any design is approved so we get driving cabs fit for purpose and not just ones that tick the boxes for compliance to various rules (and that the faceless Transport Scotland civil servant that loves front end gangways has been moved or retired!).
While I'm not going to spend too much time defending Abellio, Scotrail do need more commuter stock, 334s and 380s are out of production, so without introducing a whole new class 385s are about the only game in town. So a bit of electrification round the Fife Circle and Borders, or the remaining SPT routes, and EMUs with short distance battery capability would be an easy way to achieve this. Presumably Scotrail or the ROSCO have at least some compensation/delay repay due from Hitachi due to the problems with introduction, so it might not even cost too much.The additional 10 units were planned only if the additional 3 years extension to the contract was agreed. Thankfully it's not happening!
While I'm not going to spend too much time defending Abellio, Scotrail do need more commuter stock, 334s and 380s are out of production, so without introducing a whole new class 385s are about the only game in town. So a bit of electrification round the Fife Circle and Borders, or the remaining SPT routes, and EMUs with short distance battery capability would be an easy way to achieve this. Presumably Scotrail or the ROSCO have at least some compensation/delay repay due from Hitachi due to the problems with introduction, so it might not even cost too much.
Plenty of other inter urban commuter EMUs coming onto the UK market from a variety of manufacturers. Hitatchi thankfully aren't the only game in town. Siemens, Bombardier, CAF and Stadler are all currently or have recently manufactured EMUs for UK TOCs. We'll just have to wait till 2022 to see what the next franchisee goes for.
Very reliable as you'd expect from Hitachi, however there's still alot of issues with them from the driver's side of things. Not least the severely restricted view from the windscreen, lots of draughts in the cab, complaints of them being cold even with the heating on, terrible on anything but the driest rails - Drivers don't look forward to driving them in smirry rain as they slide very easily. All in all they're not a great unit to drive from what I hear from my colleagues and I'm not looking forward to our depot getting them on our cards in 2020. Hopefully before any future rolling stock order is made for new stock they'll engage with drivers from the beginning before any design is approved so we get driving cabs fit for purpose and not just ones that tick the boxes for compliance to various rules (and that the faceless Transport Scotland civil servant that loves front end gangways has been moved or retired!).
The 385s have settled down to be good reliable units albeit still a bit rough riding.
I'd think they would be suitable for an electrified EK line but something more metro is needed for the circle etc. As has been posted many times there are plenty of nearly new EMU's available that would fit this mould perfectly but are probably not going to be used due to "not invented here" syndrome on TS's part.
Plenty of other inter urban commuter EMUs coming onto the UK market from a variety of manufacturers. Hitatchi thankfully aren't the only game in town. Siemens, Bombardier, CAF and Stadler are all currently or have recently manufactured EMUs for UK TOCs. We'll just have to wait till 2022 to see what the next franchisee goes for.
Given Greater Anglia are ditching their 321s, why not just pull that trick again and convert a bunch more into 320s? They'll be dirt cheap, and while yes, it would be wabtec again dealing with the refurb (shudder shudder), it seemed OK last time when they created 320/4s so why not do that again if we are not politically motivated to order more 385s?The 385s have settled down to be good reliable units albeit still a bit rough riding.
I'd think they would be suitable for an electrified EK line but something more metro is needed for the circle etc. As has been posted many times there are plenty of nearly new EMU's available that would fit this mould perfectly but are probably not going to be used due to "not invented here" syndrome on TS's part.
Given Greater Anglia are ditching their 321s, why not just pull that trick again and convert a bunch more into 320s? They'll be dirt cheap, and while yes, it would be wabtec again dealing with the refurb (shudder shudder), it seemed OK last time when they created 320/4s so why not do that again if we are not politically motivated to order more 385s?