YourMum666
Member
To be Honest I think electrification should eventually go on as far as Exeter. Since it is easier and costly.
Also Network Rail should Electrify the Hereford and Cheltenham Branch. And GWR should start services to Birmingham And Wolverhampton as an upgrade. Also DfT should bring back Swansea Electrification along with the Temple Meads and Filton Branch . But yeah I think after Network Rail is done with the SWML they will now focus on CP5 and CP6
Also Network Rail should Electrify the Hereford and Cheltenham Branch. And GWR should start services to Birmingham And Wolverhampton as an upgrade. Also DfT should bring back Swansea Electrification along with the Temple Meads and Filton Branch . But yeah I think after Network Rail is done with the SWML they will now focus on CP5 and CP6