It'll be in Dundee yard sadly it's failedShould pass it later on today,will make a change from seeing lying outside the shed at haymarket for months.
It'll be in Dundee yard sadly it's failedShould pass it later on today,will make a change from seeing lying outside the shed at haymarket for months.
Oh dear,can wait to Mr Bishop's thoughts on this.It'll be in Dundee yard sadly it's failed
The train is still showing as running online?It'll be in Dundee yard sadly it's failed
No. Set swap to 158738.The train is still showing as running online?
https://www.realtimetrains.co.uk/service/gb-nr:P78001/2024-09-14/detailed#allox_id=0
Is it just running on one power car?
Slick change at Dundee to a 158.The train is still showing as running online?
https://www.realtimetrains.co.uk/service/gb-nr:P78001/2024-09-14/detailed#allox_id=0
Is it just running on one power car?
Ah, thanks for confirming.Slick change at Dundee to a 158.
Do you know what the fifth coach in HA12 is please?43128 should be tomorrow morning on freshly extended HA12.
42077Do you know what the fifth coach in HA12 is please?
Thanks42077
Saw it while passing Dundee yard,43128 looking in fine fettle.Should be right enough as ot hasn't really had the chance to get dirty yet.It'll be in Dundee yard sadly it's failed
Was it 43128 that failed or something else on the set?It'll be in Dundee yard sadly it's failed
Did notice that 128 wasn't running 035 was and that was at the buffer end in the yard.Was it 43128 that failed or something else on the set?
That doesn't imply anything - normal practice would be to shut one power car down when stabled like that with the other left supplying ETS to the set.Did notice that 128 wasn't running 035 was and that was at the buffer end in the yard.
Yeah I know but usually you'd shutdown the buffer end power car,sometimes the running would be swapped if sat for days as has happened on scotrail.That doesn't imply anything - normal practice would be to shut one power car down when stabled like that with the other left supplying ETS to the set.
Hilarious stuff. A total embarrassment of a fleet.It'll be in Dundee yard sadly it's failed
sadly emblematic of state of the HST fleet currently I feel, they are struggling and won't last forever.Hilarious stuff. A total embarrassment of a fleet.
That sounds interesting - does that mean the brake force was less than it should have been at each step on the controller?Driver complaining of soft brakes and failed by tech rider.
Maybe, or uneven pressures or overactive WSP, could be lots of things. Recharging the brake solves most issues like this but takes a wee while and ScotRail control won't let the driver fault find(cut and run policy) if there was another unit that could be stepped up quickly and keep the service more or less on time, albeit a 158.That sounds interesting - does that mean the brake force was less than it should have been at each step on the controller?
Still there this morning when I passed at 09 35.It'll be in Dundee yard sadly it's failed
are these still in slateford?Unfortunately the final 3 5th coaches which were due to enter service imminently have been heavily vandalised by children at Slateford depot and have lots of smashed windows and damaged interiors. Shame. Vehicles 42144, 42185, 42209.
Excellent, should all help with next year when they need a fair increase in diagrams to accommodate the planned enhancements in Fife.HA08 eventually returning from Wolverton to Carlisle today and onto Inverness tomorrow. 1 more set at Doncaster then a full fleet available. Only taken 8 years!
Apparently HA02 is due back in a couple of weeks, so before even the December timetable change - which sees 16 booked Mon-Fri & Sat diagramsHA08 eventually returning from Wolverton to Carlisle today and onto Inverness tomorrow. 1 more set at Doncaster then a full fleet available. Only taken 8 years!
Reliability is still not great though, on Sunday a 158 was subbed in for a 5 car HST on Edinburgh - Aberdeen runs.HA08 eventually returning from Wolverton to Carlisle today and onto Inverness tomorrow. 1 more set at Doncaster then a full fleet available. Only taken 8 years!
Accurate to this morning:Hi does anyone have an up to date list of which power cars are presently attached to which sets?
I know that RTT gives this information but you need to know every diagram and it won’t also detail those not working.