The Planner
Veteran Member
- Joined
- 15 Apr 2008
- Messages
- 15,965
Hmmm, looking at that schedule, 4 was made up from the massive dwell at Bolton and bits at other station stops. I would also suggest there was pathing time on the approach to Euxton which it didnt require. Yes, it will be better than DMU timings but not 13 minutes better.Wow!
Did the Guards feet touch the ground at Blackrod and Leyland or did they float? That is some impressive work aided by the new infrastructure and traction.