absolutelymilk
Established Member
- Joined
- 18 Jul 2015
- Messages
- 1,245
Any ideas how many tph can be supported without the "GEL"?That's not between Manchester and Euxton, and the route discussed in this thread can be energised, section proved and tested without the Great Extension Lead. The GEL is only required when a timetable with electric trains actually appears, which is looking like May 2019?