The CEP and EPB from the EPB Preservation group were based at the EKR are currently finding a new home and while part of the CEP is at eastleigh being deswindonised I believe the EPB is staying only temporarily at the EOR but There was a CIG at EOR now off to ireland to be converted to holiday lets. Also a CIG and a VEP have both been stripped to provide running gear for the 5BEL restoration project.
Www.cep7105.co.uk
Actually checking the site http://www.epbpg.co.uk/ looks like the move to EOR may be permanent.
--- old post above --- --- new post below ---
Hmm.....
Eden valley railway 2×BEP
Epping Ongar railway CEP 7105 and 2EPB
Chinnor Princes Risborough Railway CEP 1198
Dartmoor 2×CIG
Finmere 1×BIG
Electric Railway Museum Coventry various incl the remaining 210 DEMU car
NRM York and Shildon 2HAP, 2BIL, 4COR
Mid Hants 4TC (I think)
London underground 4TC
Also theres a 4EPB 4SUB a 2DD still in existence wnd this list is by no means exhaustive....
Given that some of the above are complete units, that is why I was asking why a complete class 442 unit could not be kept somewhere?
Someone mentioned that there is already a Mk3 within the NRM collection. Well, lets's take the APT trains as an example. You have the APT-E train within the NRM collection and you have the APT-P train at Crewe. Both trains have the same type of carriages within them with the only difference is that one was used to prove the technology would work, correct me if I am wrong please?
Be thankful that an end carriage is going to be saved. I see no historical reasons why a complete 442 needs to be saved as it was formed from ancient motive equipment fitted into a unit based on existing carriage stock - hardly novel, innovative or a landmark in engineering terms. They're off to Booths or EMR.
. They're off to Booths or EMR.
Hopefully EMR Kingsbury, then I won't have to go too far to cop them.
Whereas Booths would suit me better![]()
Is spotting units that are about to be dispatched into the ether really worth it?
I mean, surely if you just wait a couple of weeks longer after they've been sent to the scrapyards then the problem goes away.![]()
Of course it's worth it! I'd rather see them as trains than tin cans!
On a serious note, I won't go out of my way to see these pigs getting scrapped unless they go to Warwickshire and not Yorkshire.
The CEP and EPB from the EPB Preservation group were based at the EKR are currently finding a new home and while part of the CEP is at eastleigh being deswindonised I believe the EPB is staying only temporarily at the EOR but There was a CIG at EOR now off to ireland to be converted to holiday lets. Also a CIG and a VEP have both been stripped to provide running gear for the 5BEL restoration project.
Www.cep7105.co.uk
Actually checking the site http://www.epbpg.co.uk/ looks like the move to EOR may be permanent.
--- old post above --- --- new post below ---
Hmm.....
Eden valley railway 2×BEP
Epping Ongar railway CEP 7105 and 2EPB
Chinnor Princes Risborough Railway CEP 1198
Dartmoor 2×CIG
Finmere 1×BIG
Electric Railway Museum Coventry various incl the remaining 210 DEMU car
NRM York and Shildon 2HAP, 2BIL, 4COR
Mid Hants 4TC (I think)
London underground 4TC
Also theres a 4EPB 4SUB a 2DD still in existence wnd this list is by no means exhaustive....
What would their performance have been like had absolutely all the REP traction equipment (all the motors etc) been re-used on the piggies?
Even if they has a brand new traction package when built would we still have been looking at them getting scrapped now?
My view is even if they had brand new traction package when new, they probably would still be in the position they are now with the possibility of being scrapped.
There was a CIG at EOR now off to ireland to be converted to holiday lets.
My view is even if they had brand new traction package when new, they probably would still be in the position they are now with the possibility of being scrapped.
The reason I say possibility of being scrapped is there has not been any official confirmation that they are going to be scrapped as yet.
Now that's interesting. I wasn't aware that 442s were cleared for Hove - Havant.
Paperwork updated this week for clearance.
I seem to remember a 10 car 442 dragging a failed MPV that had failed at Lancing... It sticks in my mind as it had to wrong road from Shoreham to lancing to collect the MPV... There's a picture somewhere...
What would their performance have been like had absolutely all the REP traction equipment (all the motors etc) been re-used on the piggies?
There were 15 REPS with 8 motors on two power cars each, and 24 442s with 4 motors each, so they would only have had enough spare motors for 5 per unit. Given that the bogie design chosen for the 442 had the four motors under the single power car in the centre of the train, I suggest the 5th motor would have been unusable on a class wide basis because of the control gear being in short supply. It would be fitted on a basis of one or two sets per motor car, so there wouldn't have been enough spare control gear to go round the whole 442 fleet.
If it had been possible to recycle everything presumably they'd have gone for 30 442s?
Three REPs were retained for a period after the 442s were introduced so the traction equipment was clearly working. The number of 442s would have been based on what they needed to run the service, and of course what funding was available.
As an aside one of the retained REPs was badly damaged in the Clapham disaster.
As another aside, 2417 was a lucky unit. It collided with a cement mixer at Parkstone and derailed, the day before the Clapham crash. It was booked to work that fateful service in the morning but they had to replace it with REP/TC.
As another aside, 2417 was a lucky unit. It collided with a cement mixer at Parkstone and derailed, the day before the Clapham crash. It was booked to work that fateful service in the morning but they had to replace it with REP/TC.
Ah yes, I remember reading that.
Of course, if 2417 had worked the train that morning then there would almost certainly be people alive today who are not, due to the Mark 3's superior crashworthiness over a Mark 1.
Ah yes, I remember reading that.
Of course, if 2417 had worked the train that morning then there would almost certainly be people alive today who are not, due to the Mark 3's superior crashworthiness over a Mark 1.
My breath is not going to be baited...Be a case of wait and see if this actually does happen
I don't see how breath can be baited?!My breath is not going to be baited...
Suggestion by whom? If it's not from a reliable senior source within the rail industry, it should be disregarded.Suggestion doing the rounds is that GWR could now use some 442's as loco hauled carriages to release some 150's to go to Northern.
Be a case of wait and see if this actually does happen