fireftrm
Member
The LNER Mk 3 Buffet / First Class does have sockets throughout and there is one by the window seat in the vestibule in the Mk 4. I would have thought that a short formation set would be well within the power capacity to allow sockets throughout, can you really believe that <20 laptop chargers can overload the power supply in the existing sets? 60w per charger and you're looking at 1.2kw