Strathspey Railway Extension

Discussion in 'Railtours & Preservation' started by fraser158, 24 Jan 2014.

Thread Status:
Not open for further replies.
  1. fraser158

    fraser158 Member

    Messages:
    105
    Joined:
    7 Feb 2011
    Location:
    Inverness
    The Strathspey Railway are one step closer to Grantown-on-Spey.

    http://www.railstograntown.org/page.php?domain_name=railstograntown.org&viewpage=news
     
  2. Registered users do not see these banners - join or log in today!

    Rail Forums

     
  3. Bill EWS

    Bill EWS Member

    Messages:
    615
    Joined:
    10 Feb 2006
    Location:
    Didcot
    Great News.
     
  4. chris89

    chris89 Established Member

    Messages:
    1,286
    Joined:
    21 Dec 2009
    Location:
    West Midlands (Severn Valley)
    Great News & Thank you for posting.

    Really got to visit the Strathspey again, been far to long.

    Chris
     
  5. ianhr

    ianhr Member

    Messages:
    505
    Joined:
    17 Sep 2013
    Excellent news, this means the Strathspey is within sight of running between two fair sized towns and with a main line connection.
     
  6. STEVIEBOY1

    STEVIEBOY1 Established Member

    Messages:
    3,059
    Joined:
    31 Jul 2010
  7. clc

    clc Member

    Messages:
    1,111
    Joined:
    31 Oct 2011
    Transport Scotland will build a bridge for the railway to run under as part of a scheme to realign a section of the A95. It's a few years away yet.
     
  8. YorkshireBear

    YorkshireBear Established Member

    Messages:
    7,711
    Joined:
    23 Jul 2010
    A95 reroute got delayed in recession basically.
     
  9. fraser158

    fraser158 Member

    Messages:
    105
    Joined:
    7 Feb 2011
    Location:
    Inverness
  10. 43167

    43167 Member

    Messages:
    1,020
    Joined:
    18 Jan 2010
    Location:
    Keighley
    Been twice, last time after the last time it got extended and it was a option on a Pathfinder spinner, we had 31327.
     
  11. St Rollox

    St Rollox Member

    Messages:
    648
    Joined:
    2 Jun 2013
    Great to see the bridge being put in place and BBC Scotland plugging it on the local news.
    Fair play to all involved.
     
  12. DaveNewcastle

    DaveNewcastle Established Member Fares Advisor

    Messages:
    7,397
    Joined:
    21 Dec 2007
    Location:
    Newcastle (unless I'm out)
  13. Xenophon PCDGS

    Xenophon PCDGS Veteran Member

    Messages:
    26,220
    Joined:
    17 Apr 2011
    Location:
    A semi-rural part of north-west England
  14. ian1944

    ian1944 Member

    Messages:
    285
    Joined:
    13 Dec 2012
    Location:
    North Berwick
    According to a large-scale OS map on the NLS site, about 100 feet between pillars.
     
  15. furryfeet

    furryfeet Member

    Messages:
    448
    Joined:
    17 Apr 2008
    the strathspey railway state on their web site that the "gap" is 80 feet. I seem to remember that the length of the girders when they were in use at Ravenscraig was 27 metres, although the web site does not state as to whether the girder length has been altered during the refurbishment. I know that there have been some alterations, since the skew on the Dulnain bridge differs from the Ravenscraig installation.
     
  16. 66C

    66C Member

    Messages:
    23
    Joined:
    8 Sep 2013
    Was a double track bridge at Merry St If I remember correctly it was a 9ft skew. It has gone back in as a single track bridge on the opposite skew using the two outer girders. The bridge decks were held in with 1000+ 1" dia bolts.
     
  17. Mtough

    Mtough New Member

    Messages:
    1
    Joined:
    2 Mar 2014
    80 ft gap in old money
    26.2 metres clear span
    --- old post above --- --- new post below ---
    6 new web plates 3 per side girder had to be added to allow changed skew to fit ie very little work but this was identified before SRC agreed to take bridge in 2007 ..whilst it was donated SRC had to pay for it's taking down & movement to Aviemore in 2008
    --- old post above --- --- new post below ---
    548 bolts needed to reconnect it all new ones being used
    centre girder was not used & was scrapped
    --- old post above --- --- new post below ---
    sorry 26.2 overall
    24.2 clear span
    25.3 between centres of bearings
     
  18. fsmr