craigybagel
Established Member
- Joined
- 25 Oct 2012
- Messages
- 5,082
Isn't it because the Victoria-Ore and Brighton-Ore services switch over at Ore? So if the once a day 313 that comes up from Brighton followed the normal pattern it would form the next Victoria service at Ore, which obviously would be a problem. Running it as a shuttle to Hastings and back means the 377 coming in from Victoria can go back to there, allowing the 313 to return to Brighton.