seaviewer
Member
- Joined
- 3 Aug 2018
- Messages
- 61
I have just been trying (without much success) to find out what happens from 6 July. It sounds as though the full timetable proposed for 18 May MIGHT be restored – but I wouldn't bank on it.
I needed to find a local timetable for south London, so went to the NRT list of tables, to find a rather interesting entry:
T175-F London Victoria, Clapham Junction, Stratford-upon-avon Parkway, St Pancras International, Farringdon, City Thameslink, London Blackfriars, London Bridge, Norwood Junction, East Croydon
Rather a roundabout route? But fun!
I needed to find a local timetable for south London, so went to the NRT list of tables, to find a rather interesting entry:
T175-F London Victoria, Clapham Junction, Stratford-upon-avon Parkway, St Pancras International, Farringdon, City Thameslink, London Blackfriars, London Bridge, Norwood Junction, East Croydon
Rather a roundabout route? But fun!