malc-c
Member
- Joined
- 1 Dec 2017
- Messages
- 990
Hi malc-c thanks for video - good to see the sleepers on the curve.
Re the switch at Langley junction - is it welded in the down running line - presumably 'locked off' in some way.
Excuse the low level of knowledge here!
Hey don't put yourself down on the level of knowledge, I'm in the same boat I'm just an enthusiast, I have no in-depth knowledge of terminologies etc.
Regarding the work done last night on the up-slow, I have no idea if the track was welded or if the panels were bolted. Looking at the video I have of the switch on the down slow at the junction I can't see any signs of joiners so would presume that the track is welded. Mind you it makes no difference as they will cut the track where needed, and then install the panel. I'm just hoping that the switch will be installed just north of the A602 bridge rather than under the bridge so I get some decent footage