Thameslink 2018 Timetable Consultation Part 2

Status
Not open for further replies.

Verulamius

Member
Joined
30 Jul 2014
Messages
246
Thameslink issued a press release yesterday explaining the incremental changes in the timetables up to December 2019.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
8,881
Location
Central Belt
Very bad news for stations south of Stevenage

They get.
1. less capacity
2. Slower services (everything stuck on slow line)

Although others may argue staying at Kings Cross may be a benefit considering how the problems in the core kill off the Bedford line. Hopefully they don’t have enough class 700s to ruin the network with the service split and we can keep the 365s.

Govia Thameslink Railway has announced the range of benefits that will be delivered in May 2018 as it modernises the biggest rail network in the country, bringing in new trains operating on new improved infrastructure with new working practices.

As planned, from May next year passengers will see a transformation in services, much of it delivered through the Government-sponsored £7bn Thameslink Programme, which will deliver brand new, reliable timetables, extended routes, additional services and new trains.

This programme is the biggest investment since Victorian times. It will expand the Thameslink network and transform north-south travel across London and the south east. It will create more space and comfort and greater access for disabled passengers, with innovative systems telling passengers where to move for more space on each train.

In total, this first phase will immediately give passengers 70% of the programme’s overall capacity benefits, which include:

  • Added capacity into London for 35,000-40,000 more passengers in each three-hour peak across the whole GTR network
  • New cutting-edge Class 700 Thameslink trains across an expanded Thameslink network
  • New north-south cross-London connections for Cambridge and Peterborough (via Gatwick), Littlehampton, Greenwich, Dartford, Medway Towns, East Grinstead and Horsham
  • New links to Gatwick Airport, Eurostar at St Pancras and interchange at Farringdon for Elizabeth line Crossrail services across central London (from December 2019).
  • Return of cross-London Thameslink services at London Bridge – up to 12 trains per hour in the peak, including Bedford to Brighton services.
  • The full implementation of the new Southern timetable bringing passengers greater levels of reliability
Further improvements will then be delivered every six months as part of three additional consecutive timetable changes, adding still more services to the cross-London Thameslink network and, finally, new routes between Cambridge and Maidstone East so that, by December 2019, there will be 24 trains per hour across the centre of London at the busiest times – a tube-like service with trains every 2-3 minutes.

Charles Horton, Chief Executive Officer of GTR, said: “Passengers will see a transformation in services in May next year, when 70% of the overall capacity benefits of this exciting programme will be delivered including the full implementation of the new more reliable Southern timetable, extended routes, additional services and new trains.

“Overall there will be a massive increase in capacity for passengers into London on an expanded Thameslink network that will give passengers at Cambridge, Peterborough, Littlehampton, Medway Towns, East Grinstead and Horsham new services north-south across London.”

Chris Gibb, Chair of the Thameslink Programme Industry Readiness Board, said: “By phasing the introduction of the new timetable in this way, we have front-loaded the benefits for passengers and then spread further changes in such a way that they can be more reliably introduced.

“Passengers will still enjoy almost as many additional trains in May as previously planned and we are doing some things earlier with an early introduction of some off-peak Thameslink trains through to the East Coast Mainline in April and the early use of the London Bridge route to give performance improvements.

“We have also spread out the introduction of the rest of the cross-London services over three further timetable changes instead of just one. This will reliably embed new operating principles in a progressive manner, enabling a smoother introduction with reduced risk of passenger disruption from too much change at any one time.”

Ends

Editor’s notes

70% of the capacity uplift will be delivered in May 2018 with additional capacity for 35,000-40,000 passengers into London during the three-hour morning peak. As a comparison, 68,000 people travel into London Bridge station between 8am and 9am.

From May 2018, the expanded Thameslink network will provide the following connections:

  • New direct Thameslink routes through London between:
  1. Cambridge and Brighton
  2. Horsham and Peterborough
  3. Luton and Kent Medway Towns (e.g. Greenwich and Dartford)
  4. Littlehampton and Bedford
  5. East Grinstead and Bedford
  • Faster, seamless journeys: Cambridge to Gatwick Airport 20% faster; Greenwich to Luton Airport 37% faster; 10-15 minutes quicker to Canary Wharf and Paddington via Crossrail (Elizabeth Line) at Farringdon
  • More spacious trains: new Siemens-built Class 700 Thameslink trains, many the size of 21 double decker buses.
From December 2019 additional new connections will be created between Maidstone East and Cambridge.

GTR will shortly be launching its consultation into the new weekend timetable. The results of phase 2 of the consultation and the final weekday timetable for May 2018 will be available in the New Year.

Thameslink Programme:

The Government-sponsored Thameslink Programme combines, new trains, new track, new signalling, expanded infrastructure and station improvements to deliver better connections to more destinations. This investment, the biggest since Victorian times, will transform north-south travel across London and the South east, delivering significant improvement that responds to the growth in passenger demand now and into the future.


How the new Thameslink service will be introduced

May 2018 – 18 trains per hour in the peak between St Pancras and Blackfriars: services from Cambridge to Maidstone East operate between Cambridge and London King’s Cross; Southeastern continues to operate Maidstone East to Blackfriars. This will still double the number of trains on the Catford Loop (between Bickley and Denmark Hill, via Catford) and two trains per hour will continue across central London, from Orpington rather than Sevenoaks as today delivering major benefits for passengers.

December 2018 – 20 trains per hour in the peak between St Pancras and Blackfriars: additional 1 train per hour Cambridge-Brighton; additional 1 train in peak Littlehampton – Bedford (50% increase on existing service)

May 2019 – 22 trains per hour in the peak between St Pancras and Blackfriars: Welwyn Garden City – King’s Cross trains and Blackfriars – Sevenoaks trains run as joined-up Welwyn Garden City – Sevenoaks services

December 2019 – 24 trains per hour in the peak between St Pancras and Blackfriars: Cambridge – King’s Cross trains (2 trains per hour) extended to/from Maidstone East.

ETCS (European Train Control System) and ATO (automatic train operation) will be introduced in 2018 although it will not be needed until May 2019.

Extending the introduction of the timetable over four phases between 2018 and 2019 will enable a smoother introduction and reduce the risk of passenger disruption from too much change at any one time. This will allow Network Rail and the operators to learn and implement lessons from each phase to provide a more resilient service for passengers.
0
0
 

philjo

Established Member
Joined
9 Jun 2009
Messages
2,892
Very bad news for stations south of Stevenage

They get.
1. less capacity
2. Slower services (everything stuck on slow line)

Although others may argue staying at Kings Cross may be a benefit considering how the problems in the core kill off the Bedford line. Hopefully they don’t have enough class 700s to ruin the network with the service split and we can keep the 365s.
0

Though if the stoppers use 365s they will still be restricted to 4 coaches as they call at the village stations.
 

philjo

Established Member
Joined
9 Jun 2009
Messages
2,892
The northbound platforms at Shepreth and Foxton have been extended to 8 coaches. It is now planned that the southbound platforms for Shepreth and Foxton and both directions at Meldreth will remain as 4 coaches. Services calling at these platforms will need to use SDO.

Shepreth and Foxton northbound were extended as if SDO was used the rear of the train would block the level crossings adjacent to the platforms (including the busy A10 at Foxton). The extensions will ensure the level crossing is clear when the train stops at the station.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
8,881
Location
Central Belt
I guess an 8 coach 700 is better in terms of capacity than a 4 coach 365.

Be interesting now that Welwyn Garden City service wont go through the core until at least 2019 (If ever) how many will change at Stevenage (If coming from the north) or Finsbury Park.

As I said earlier sickening to have yet another step down in service with no benefits. But I guess people from Blackfriars heading south have struggled for many years so I can’t complain (until they decide 24 TPH will never be achievable)
 

387star

On Moderation
Joined
16 Nov 2009
Messages
6,655
The northbound platforms at Shepreth and Foxton have been extended to 8 coaches. It is now planned that the southbound platforms for Shepreth and Foxton and both directions at Meldreth will remain as 4 coaches. Services calling at these platforms will need to use SDO.

Shepreth and Foxton northbound were extended as if SDO was used the rear of the train would block the level crossings adjacent to the platforms (including the busy A10 at Foxton). The extensions will ensure the level crossing is clear when the train stops at the station.
shepreth and meldreth oddly have pink rather than blue paint on their station lighting
 

TT-ONR-NRN

Established Member
Joined
30 Dec 2016
Messages
10,473
Location
Farnham
Are they ditching the “Great Northern” brand in favour of an all round Thameslink one then?
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
28,058
Location
UK
Are they ditching the “Great Northern” brand in favour of an all round Thameslink one then?

No. Great Northern trains will run to King's Cross or Moorgate. Thameslink ones will go through the core. The branding should help passengers know which is which.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
28,058
Location
UK
Have the 700s currently on ECML services been rebranded to GN yet then?

No and I don't believe they will be as it's only until May when they should begin showing as Thameslink services (or even April).
 

class387

Established Member
Joined
9 Oct 2015
Messages
1,525
I've just been told that the GN brand won't be dropped after all though.
The GN brand will remain for services to/from Moorgate (using 717s), the Cambridge and Kings Lynn 387 fasts and peak 365 extras to Peterborough. All 700 operated services will go through the core and be rebranded Thameslink in the next two years, hence why they aren't having GN branding.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
28,058
Location
UK
I wonder what will happen to staff uniforms? It would have made sense to have both logos when TL and GN were based on the same design. Now it would look odd.

Has this been considered, along with branding on ticket machines and the like?
 

Skimble19

Established Member
Joined
12 Dec 2009
Messages
1,489
Location
London
Nothing is concrete yet, some stations that are currently GN will soon only have TL services so the focus will be on what to do with those first, if anything at all.
I've just been told that the GN brand won't be dropped after all though.
That’s never been the plan so hardly a “after all”..
 

TT-ONR-NRN

Established Member
Joined
30 Dec 2016
Messages
10,473
Location
Farnham
Nothing is concrete yet, some stations that are currently GN will soon only have TL services so the focus will be on what to do with those first, if anything at all.

That’s never been the plan so hardly a “after all”..

Meaning what?
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
8,881
Location
Central Belt
Meaning what?

Probably like other examples of multiple operators services for this station are provided by Thameslink and Great Northern.

Can anyone think of any stations if / when the full timetable is introduced in 2020 that won’t have any great northern services? I can’t when you include the peak.

However companies managing stations that don’t have any services they operate stopping at them isn’t new either.
 

TT-ONR-NRN

Established Member
Joined
30 Dec 2016
Messages
10,473
Location
Farnham
Probably like other examples of multiple operators services for this station are provided by Thameslink and Great Northern.

Can anyone think of any stations if / when the full timetable is introduced in 2020 that won’t have any great northern services? I can’t when you include the peak.

However companies managing stations that don’t have any services they operate stopping at them isn’t new either.

I mean what do you mean by the "after all" bit.
 

Skimble19

Established Member
Joined
12 Dec 2009
Messages
1,489
Location
London
Probably like other examples of multiple operators services for this station are provided by Thameslink and Great Northern.

Can anyone think of any stations if / when the full timetable is introduced in 2020 that won’t have any great northern services? I can’t when you include the peak.

However companies managing stations that don’t have any services they operate stopping at them isn’t new either.
Arlesey and Sandy won’t have any GN services during the day although they will have a few very early in the morning and late at night (generally first and last few services of the day).
I mean what do you mean by the "after all" bit.
I was quoting you.. you said it won’t be dropped “after all”. That was never the plan.
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
13,197
Can anyone think of any stations if / when the full timetable is introduced in 2020 that won’t have any great northern services? I can’t when you include the peak.

However companies managing stations that don’t have any services they operate stopping at them isn’t new either.

How about Arlesey? I think the peak hours Peterborough-Kings Cross services will be 'fast line' ones.

Thameslink and Great Northern are all one company.
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,810
Location
UK
Full 24tph Thameslink service has been delayed until December 2019.
https://www.theguardian.com/uk-news...-rail-completion-delayed-london-december-2019

I imagine we'll be seeing 20tph through the core with the Catford Loop services terminating at Blackfriars and corresponding services terminating at St Pancras High Level, until they do the extra work to enable ATO, which I believe was the plan for May-Dec next year anyway.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
28,058
Location
UK
Full 24tph Thameslink service has been delayed until December 2019.
https://www.theguardian.com/uk-news...-rail-completion-delayed-london-december-2019

I imagine we'll be seeing 20tph through the core with the Catford Loop services terminating at Blackfriars and corresponding services terminating at St Pancras High Level, until they do the extra work to enable ATO, which I believe was the plan for May-Dec next year anyway.

You are right about Blackfriars but I think the services from the north will go in to King's Cross as it's the former GN services that won't be running at full capacity for a while, and even then it's staged over the year - not a year wait and then all in one go.
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,810
Location
UK
You are right about Blackfriars but I think the services from the north will go in to King's Cross as it's the former GN services that won't be running at full capacity for a while, and even then it's staged over the year - not a year wait and then all in one go.

Sorry, I meant to write KX. They're too close together, just a little slip!
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
8,881
Location
Central Belt
Full 24tph Thameslink service has been delayed until December 2019.
https://www.theguardian.com/uk-news...-rail-completion-delayed-london-december-2019

I imagine we'll be seeing 20tph through the core with the Catford Loop services terminating at Blackfriars and corresponding services terminating at St Pancras High Level, until they do the extra work to enable ATO, which I believe was the plan for May-Dec next year anyway.
Full statement on post 122 of this very thread. Detailing what will happen and when along with what may not happen. (Ever)
 

class387

Established Member
Joined
9 Oct 2015
Messages
1,525
Now that slower services on the GN route will not go through the core until at least 2019, does anyone know whether they will be operated by 365s (and some 387s) until then or go over to 700 RLUs into Kings Cross?
 

AM9

Veteran Member
Joined
13 May 2014
Messages
14,270
Location
St Albans
Now that slower services on the GN route will not go through the core until at least 2019, does anyone know whether they will be operated by 365s (and some 387s) until then or go over to 700 RLUs into Kings Cross?

Surely they will be operated with 700s as they become available. There's no point storing new trains in sidings and then expecting everything to work on day one of a full new timetable particularly when those trains' reliability is still the responsibility of the manufacturers. That will allow any excess class 365s to be cascaded or pensioned off asap.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
17,774
Location
Hertfordshire / Teesdale
Surely they will be operated with 700s as they become available. There's no point storing new trains in sidings and then expecting everything to work on day one of a full new timetable particularly when those trains' reliability is still the responsibility of the manufacturers. That will allow any excess class 365s to be cascaded or pensioned off asap.

You may well be right that this is what will happen in reality, however 1x700/0 replacing 2x365 (or, in some cases, originally 2x317/321) presents a big problem in seating availability.

There would be a problem using multiple 365s on the slow Cambridge services due to the cheapo way the platform extensions have been done (or more to the point haven't been done) at Meldreth, Shepreth and Foxton.

A mix of something like the current GN service plus some new Thameslink services providing extra capacity would be a much better solution, and would keep most people pretty happy. It would be more reliable too, which remains the biggest risk of the whole thing.
 

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,189
Surely they will be operated with 700s as they become available. There's no point storing new trains in sidings and then expecting everything to work on day one of a full new timetable particularly when those trains' reliability is still the responsibility of the manufacturers. That will allow any excess class 365s to be cascaded or pensioned off asap.

You mean not unlike what they are doing now, we’ve got some 700s that have been sitting idle in some sidings for weeks now. They don’t even use them for driver training.
 
Last edited: