Electrification threads and resources index

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs
Another set of old threads indexed. I note many on GWML in various forms - indexed below - similarly for NW and GOBLIN etc. I will tidy up in the next month or two and do some groupings etc.

Great Western Electrification Threads
https://www.railforums.co.uk/threads/great-western-electrification.54721/

https://www.railforums.co.uk/threads/gwml-electrification-scheme.68349/

https://www.railforums.co.uk/threads/gwml-electrification-which-route-first.75188/

https://www.railforums.co.uk/threads/electrification-west-of-newbury.75038/

https://www.railforums.co.uk/threads/reading-electrification.64167/

https://www.railforums.co.uk/threads/paddington-ohle.66456/

https://www.railforums.co.uk/threads/south-wales-electrification.63072/

https://www.railforums.co.uk/threads/great-western-electrification.75928/

https://www.railforums.co.uk/threads/electrification-of-gwml-around-reading.77348/

https://www.railforums.co.uk/threads/gwml-electrification-progress-newbury-reading-b-h-section.63168/

https://www.railforums.co.uk/threads/gwml-electrification.86756/

https://www.railforums.co.uk/threads/cardiff-swansea-electrics-as-the-professor-sees-it.42977/

https://www.railforums.co.uk/threads/gw-to-be-electrified.38469/

https://www.railforums.co.uk/threads/great-western-mainline-electrification.35642/

https://www.railforums.co.uk/threads/gwml-electrification-when-does-work-start.29288/


Midlands Barnt Green – Chase Line -NUCKLE

https://www.railforums.co.uk/threads/barnt-green-to-bromsgrove-electrification-what-is-the-status.56216/

https://www.railforums.co.uk/threads/stratford-upon-avon-electrification.69752/

https://www.railforums.co.uk/threads/electrifying-coventry-to-leamington.77504/

https://www.railforums.co.uk/threads/snow-hill-electrification-and-172-cascade.49749/


Older GOBLIN threads

https://www.railforums.co.uk/threads/gospel-oak-to-harringay-junction-electrification-as-part-of-thameslink.61764/

https://www.railforums.co.uk/threads/goblin-electrification-it-may-still-happen.68804/


DC Electrification Threads

https://www.railforums.co.uk/threads/overhead-d-c-catenary.17010/

https://www.railforums.co.uk/threads/ohle-25kv-or-750v-dc-third-rail.59/

https://www.railforums.co.uk/threads/converting-third-rail-to-overhead-wiring.36453/
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs
Older threads indexed

Northwest Electrification Threads

https://www.railforums.co.uk/threads/electrification-north-west.62123/

https://www.railforums.co.uk/threads/lpool-m-c-electrification.74910/

https://www.railforums.co.uk/threads/manchester-to-liverpool-electrification-wires-up-this-christmas.75502/

https://www.railforums.co.uk/threads/wires-to-windermere-announced.88053/

https://www.railforums.co.uk/threads/northern-electrifcation-to-go-ahead.37568/

https://www.railforums.co.uk/threads/blackpool-electrification-comes-before-bolton.49830/

https://www.railforums.co.uk/threads/electrification-of-fylde-line.43421/

https://www.railforums.co.uk/threads/northwest-electrification-projects.43336/

https://www.railforums.co.uk/threads/north-west-electrification.42553/

https://www.railforums.co.uk/threads/north-west-electrification-query.38659/

https://www.railforums.co.uk/threads/electrification-schemes-north-west-england.34479/

https://www.railforums.co.uk/threads/north-west-electrification.29778/

https://www.railforums.co.uk/threads/further-electrification-in-the-north-west-details-announced.28837/

https://www.railforums.co.uk/threads/electrification-time-scales-update-north-west.93819/

https://www.railforums.co.uk/threads/nw-electrification-progress.74399/


Transpennine Threads

https://www.railforums.co.uk/threads/york-leeds-electrification.27535/

https://www.railforums.co.uk/threads/fantasy-my-transpennine-electrification-upgrade-ideas.60116/

https://www.railforums.co.uk/threads/electrification-east-of-selby.75530/

Midland Mainline Electrification Threads

https://www.railforums.co.uk/threads/mml-electrification.85697/

https://www.railforums.co.uk/threads/estimated-cost-of-mml-electrification.34989/

https://www.railforums.co.uk/threads/mml-electrification.35031/

https://www.railforums.co.uk/threads/mml-electrification-included-in-draft-northern-rus.37329/

https://www.railforums.co.uk/threads/electrifying-the-midland-photos-from-the-1970s.54804/

https://www.railforums.co.uk/threads/midland-mainline-electricification.68445/


Scottish Electrification and EGIP Programme Threads

https://www.railforums.co.uk/threads/good-news-for-glasgow-to-edinburgh-travellers.25959/

https://www.railforums.co.uk/threads/is-lockerbie-haymarket-electrified.29264/

https://www.railforums.co.uk/threads/scottish-electrification.32728/

https://www.railforums.co.uk/threads/central-scotland-electirification.34320/

https://www.railforums.co.uk/threads/electification-to-dunblane-eventually.37725/

https://www.railforums.co.uk/threads/edinburgh-electrification.37308/

https://www.railforums.co.uk/threads/egip-electrification.84554/

https://www.railforums.co.uk/threads/paisley-canal-electrification.54672/

https://www.railforums.co.uk/threads/paisley-canal-electrification.68334/

https://www.railforums.co.uk/threads/paisley-canal-electrication.74677/
 
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs
February 2018 Threads

Robustness of OHLE - Material Selection and Science
https://www.railforums.co.uk/threads/how-is-ohle-so-robust.160527/page-3#post-3331258

Which former railway Companies have pulled the short straw on electrification

PLEASE NOTE GREAT THREAD FOR SUMMARY OF ELECTRIFICATION DATES ETC.

https://www.railforums.co.uk/thread...aw-regarding-electrification-projects.160774/

Petition calling for continued investment in electrification
https://www.railforums.co.uk/thread...in-electrification.161160/page-3#post-3360185
 
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs
Upcoming from the PWI

Book now for our next seminar on April 25th at Swindon Railway Centre

Railway Junctions; the electrification challenges is our first technical seminar in the field of electrification. The seminar will cover turnout design, construction and maintenance.

Peter Dearman, Electrification Advisor to Bechtel has the following comments:

"This seminar will be of interest to anyone who wants to understand better this important aspect of OLE Engineering. The topic demonstrates the synergy and inter-dependence of the OLE and track disciplines. Speakers currently working on electrification of the Great Western and other major projects in the UK will share their knowledge and the lessons they have learned, presenting a prescient snap shot of current best practice and the pitfalls along the way. Track Engineers and OLE Engineers will benefit from the discussion and debate that the seminar will doubtless prompt.

For those in OLE Engineering there is an additional potential which I hope this seminar will start to unlock. The professional recognition of OLE Engineering skills across design and construction does not presently match the true value of those unique specialist skills. It is my hope that we can develop and nurture the role of the PWI in seminars, conferences and networking throughout the OLE community. We can then work with the PWI to put in place a proper scheme for the formal accreditation of professional standards for OLE Engineers which will be recognised throughout the rail industry. Clients, suppliers and individuals will all benefit from such a scheme.

Whatever the future holds in that regard, this turnout seminar offers a fascinating insight into an aspect of electric railway engineering which deserves and needs to be better understood. I would encourage you to share details of this event with your colleagues. I am looking forward to the day and hope to see you there"
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs
Enhancements Delivery Plans Updates summary - these are the ones I can find that are still clickable. Please feel free to add any that are missing. I can not for example find a clickable Sept 2017 update.

Enhancements Delivery Plan October 2018 (posted down thread too)
https://cdn.networkrail.co.uk/wp-content/uploads/2018/10/Enhancement-Delivery-Plan-.pdf


Enhancements Delivery Plan March 2018 (posted down thread too)
https://cdn.networkrail.co.uk/wp-content/uploads/2018/04/EDP-March-2018.pdf

Enhancements Delivery Plan Dec 2017

https://cdn.networkrail.co.uk/wp-content/uploads/2017/12/Enhancements-Delivery-Plan.pdf

Enhancements Delivery Plan June 2017.
https://www.networkrail.co.uk/wp-content/uploads/2017/06/Enhancements-Delivery-Plan-June-2017.pdf

Enhancements Delivery Plan March 2017.
https://www.networkrail.co.uk/wp-content/uploads/2017/04/Enhancements-Delivery-Plan.pdf

Enhancements update December 2016
http://www.networkrail.co.uk/wp-con...Enhancements-Delivery-Plan-September-2016.pdf

Enhancements update September 2016
http://www.networkrail.co.uk/wp-con...Enhancements-Delivery-Plan-September-2016.pdf
 
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs
IN PROGRESS
Mid May 2018– Electrification or new build electrifying in Progress


1) Manchester to Preston - behind schedule but massive progress made recently. Many problem bases now done and many more masts up. Still not many miles of wires. Regular updates here https://www.railforums.co.uk/threads/blackpool-manchester-electrification.66879/

2) Preston - Blackpool North - complete. Electric trains running

3) Man Vic- Miles Platting area - in progress https://www.railforums.co.uk/threads/manchester-stalybridge-electrification.148433/
4) Bolton to Wigan North Western - GRIP 3
5) Great Western Main Line London - Cardiff - great progress - likely to be energized as far as Wooton Bassett early June
6) Midland Main Line to Kettering and Corby only - some recent progress with masts and extra tracks.
7) Gospel Oak to Barking Line (GOBLIN) - complete
8) Barnt Green to Bromsgrove - complete. Electric trains running
9) Chase Line from Walsall to Rugeley Trent Valley - in progress
10) Edinburgh Glasgow Improvement Programme (EGIP)
a) via Falkirk High - complete
b) Edinburgh – Glasgow via Shotts - looks slightly ahead of schedule
c) Rolling Programme -- Cumbernauld - Falkirk Grahamston etc energized
- Stirling- Dunblane -Alloa - good progress made
11) Crossrail (yes new build but it will be electrified from the start) -almost complete
12) HS2 (yes new build but it will be electrified from the start)

Awaiting DfT/SoS sign off-decision
North Transpennine Route Upgrade/possible partial electrification
Transpennine Route Upgrade and Electrification, CP6
http://www.railforums.co.uk/showthread.php?t=88054
 
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs
Forth BRIDGE - How would you electrify it?
https://www.railforums.co.uk/threads/forth-bridge-how-would-you-electrify-it.166668/

TRIVIA- AC Electrification using overhead conductor bars instead of catenary
https://www.railforums.co.uk/thread...ad-conductor-bars-instead-of-catenary.166890/

Which is better and why - overhead or 3rdrail electrification? (Not in infrastructure forum but in UK Rail Discussion )
https://www.railforums.co.uk/thread...er-head-or-third-rail-electrification.167594/

Electrification of Northern Wales
https://www.railforums.co.uk/threads/electrification-of-northern-wales.167663/
 
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs
IN PROGRESS
July 2018– Electrification or new build electrifying in Progress

1) Manchester to Preston and Blackpool North plus Man Vic – Miles Platting area -due before Dec 2018
a) Preston - Blackpool North - complete. Electric trains running
b) Preston - Manchester - seriously behind schedule but major progress now being made -due before Dec 2018
c) Man Vic- Miles Platting area - in progress -due before Dec 2018
2) Bolton to Wigan North Western - GRIP 3 highly likely to go ahead according to two (not written) sources
3) Great Western Main Line London - Cardiff - due Dec 2018. Good progress being made but doubts expressed as to whether Cardiff will be reached by this date. Bristol Parkway more likely according to some sources.
4) Midland Main Line to Kettering and Corby only - reports it may go to Market Harborough - progressing
5) Gospel Oak to Barking Line (GOBLIN) - complete - but no passenger electrics running just yet-freight only electrics
6) Barnt Green to Bromsgrove - complete electric trains running.
7) Chase Line from Walsall to Rugeley Trent Valley - in progress
8) Edinburgh Glasgow Improvement Programme (EGIP)
a) via Falkirk High - complete electric trains running
b) via Falkirk Grahamston-complete
c) Edinburgh – Glasgow via Shotts -due March 2019 but ahead of schedule
d) Rolling Programme -Stirling- Dunblane -Alloa - being energized progressively
9) Crossrail (yes new build but it will be electrified from the start)
10) HS2 (yes new build but it will be electrified from the start)

Awaiting DfT/SoS sign off-decision

North Transpennine Route Upgrade/possible partial electrification
Transpennine Route Upgrade and Electrification, CP6
http://www.railforums.co.uk/showthread.php?t=88054
 
Last edited:

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,495
Location
Between Peterborough & Bedlington
IN PROGRESS
July 2018– Electrification or new build electrifying in Progress


5) Gospel Oak to Barking Line (GOBLIN) - complete
8) Edinburgh Glasgow Improvement Programme (EGIP)

b) Edinburgh – Glasgow via Shotts -due Dec 2018
c) Rolling Programme -- Cumbernauld - Falkirk Grahamston etc- Stirling- Dunblane -Alloa - being energized progressively

To correct a few points: the GOBLIN now has electric freight trains running, but delays to the 710s are keeping pax workings as diesel.
Re the EGIP: Edinburgh to Glasgow QS via both Falkirks are complete, and the "SDA" (i.e. Stirling-Dunblane-Alloa) wiring is due to be finished by the end of the year. Shotts isn't due to be commissioned until March 2019 (last I heard).
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs
To correct a few points: the GOBLIN now has electric freight trains running, but delays to the 710s are keeping pax workings as diesel.
Re the EGIP: Edinburgh to Glasgow QS via both Falkirks are complete, and the "SDA" (i.e. Stirling-Dunblane-Alloa) wiring is due to be finished by the end of the year. Shotts isn't due to be commissioned until March 2019 (last I heard).
Thank you . I have made corrections to previous post but will update the front page 1st post September 1st approx
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,901
Location
Dalton GA USA & Preston Lancs
IN PROGRESS
September 2018– Electrification or new build electrifying in Progress

1) Manchester to Preston and Blackpool North plus Man Vic – Miles Platting area -due before Dec 2018 - huge progress now being seen
a) Preston - Blackpool North - complete.
b) Preston - Manchester - seriously behind schedule -due before Dec 2018
c) Man Vic- Miles Platting area - in progress -due before Dec 2018
2) Bolton to Wigan North Western - GRIP 3 highly likely to go ahead according to two (not written) sources - other sources say just simmering.
3) Great Western Main Line London - Cardiff - due Dec 2018 some rumours suggest it may only get to Bristol Parkway by then
4) Midland Main Line to Kettering and Corby only - reports it may go to Market Harborough
5) Chase Line from Walsall to Rugeley Trent Valley-due Dec 2018?
6) Edinburgh Glasgow Improvement Programme (EGIP)
a) via Falkirk High - complete
b) Edinburgh – Glasgow via Shotts -due Dec 2018
c) Cumbernauld - Falkirk Grahamston etc- -complete
d) Rolling Programme Stirling- Dunblane -Alloa - being energized progressively
7) Crossrail (yes new build but it will be electrified from the start)
8) HS2 (yes new build but it will be electrified from the start)

Awaiting DfT/SoS sign off-decision

North Transpennine Route Upgrade/possible partial electrification
Transpennine Route Upgrade and Electrification, CP6
http://www.railforums.co.uk/showthread.php?t=88054
 